Submits Proposed Changes to Tech Spec 3.14,revising Requirement That Two Independent Circuits of Hydrogen Purge Sys Be Operable W/Provisions to Remove One Circuit from Svc for 30 Days
ML19320A239
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/26/1977
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To:
References
1-087-7, 1-87-7, NUDOCS 8004210533
Download: ML19320A239 (3)


Text

- --- -__ _ _ _ _ _ _ _ - _ _ - _ _ _ _

DISTRIBUTION AFTER ISSUANCE OF OPERATING LICENSE N,.CfcRM 195 --

U.s. NUCLEAD REGULATOnY CD * 'SSION OCCKET NUM SER a.m # 4, Q 3 Jj j NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL FROM: DATE OF OCCVMENT lTO: Arkansas Power & Light Company 8/26/77

! Little Rock, Arkansas Mr. D. K. Davis William Cavanaugh III 37, ,,$b@37 k1TTEH CNOTCRITED PROP (NPUT PORM NUMSER OF CCPtEs RECEIV!D h2fGINAL UNC LASSIPIE D C cc" l $le Nen CEICP!'TIO N ENCLCSURE Concerns tech specs in Section 3,14 which require that two independent circuits of the Hydrogen Purge System be operable with provisions to remove one circuit from service for a period of 30 days.....

ACKNOWLEDGED

.- w s nx H'

(2-P) \db' ,

PLANT NAME: Arkansas Unit No.1 RJL 8/30/77 SAFETY FOR ACTION /INFORMATION BRANCH CHIEF: (7) 1 AOl_C . 1 I .I ii l I i

!  ! I Li i i f[ ore: eTv e >

T INTcRNAL DISTRIBUTION l l

l ' NRC PDR I l I C E (2) l .

i OELD HANAUER l l CHECK I i i STELLO l l l l lEISENHUT l i

' SHA0 i  !

IBAER l '

SUTLER l t GRIMES i i J. COLLINS  ;

s I e l l , I I l l l 1 I i l i l i I EXTERNAL DISTRIBUTION CONTROL NUM BER ,

iLPDR: RuS3 e tt ui he. iArK. I I

.y*

e ,

i TIC l' l NSIC i h i 16 CYS ACFS SENT CATEbO!tY B i

. !l l, eec4 21o 573

H EL PIN G BUILO ARKANSA9 ARK ANS AS POWER G LIGHT COMPANY ss O sox 551 LITTLE AOCK, A As< ANS AS 72203.(5013371-4000 August 26, 1977 ng ~~of M-_Tl! -

, , q l ,,g

[g\ - 4"//v'?)

, ,. s 1-087-7 y , ' .( -

4-k.!

fW d

'* , . ! .: Y Director of Nuc1 car Reactor Regulation '.f a

ATTN: Mr. D. K, Davis, Acting Chief Operating Reactors Branch #2 m

N)g')1'e

  • i . .

g ..T C",

Q'Ol#

U. S. Nuclear Regulatory Commission  ;- o.S-4 Washington, D. C. 20555 (%s

Subject:

Arkansas Nuclear One-Unit 1 N i]Th-

{

Docket No. 50-313 License No. DPR-51 Technical Specifications (File: 1511.1)

Gentlemen:

The Arkansas Nuclear One-Unit 1 (ANO-1) Technical Specifications in Section 3,14 require that two independent circuits of the Hydrogen Purge System be operable with provisions to remove one circuit from service for a period of 30 days. Specification 3.14.3 also requires that if both circuits are inoperable the reactor be placed in the cold shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

We currently are in a situation which has taken both circuits of the system out of service due to the need to replace filter cartridges in both citicuits. This filter change takes both circuits out of service '

due to the in-place testing requirements of Specification 4.12.1.

Those in-place tests must be perfomed by a fim other than AP6L and they cannot be perfomed within the 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> allowed.

In researching this matter, we find that the Standard Technical Specifi-cations allow the entire Hydrogen Purge System to be inoperable for 30 days. Due to the following facts, we believe that the allowable outage time provided in the Standr.rd Technical Specifications is appropriate for ANO-1:

1. Per FSAR Section 6.6, the ifydrogen Purge System is not required to function until 11.5 days following a IDCA; and, 7

T A x P AveNG, INVESTOA OWNE D MEMBE A MIDOLE SOUTH UTILITIES S Y STEM u _

Mr. D. K. Davis August 26, 1977 1-087c7

2. Per Section 6.2.4 of the NRC's Safety Evaluation Report (SER) for ANO-1 (June 6,1973), the NRC calculated thyroid and whole body doses at t!ra Low Population Zone (LPZ) for the course of an accident situation due to hydrogen purge are less than 1 Rem. Since a DF of 10 is allowed for the filters, this value would increase to about 10 Rem if no filters were installed. When the additional 9 Rem from such an assumption are added to the total doses on Table 15-1 of the SER, the resultant dose is still well within the requirements of 10CFR100.

Therefore, we propose the following change to Specifications 3.14.2 and 3.14.3:

Specification 3.14.2 -

Delete Specification 3.14.3 -

Change number to 3.14.2 and revise to read as follows: -

"If the requirements of specification 3.14.1 cannot be met, the system shall be returned to operable status within 30 days or the reactor shall be placed in the hot shutdown condition within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. ~

Your immediate attention to this matter is requested.

Ve truly yours, J

Q-

.g _ _ . .

William Cavanaugh III Executive Director t Generation 6 Construction ,

WC:DAR:tw