Text
- _ - - - _ . _ - _ _ _ _
_
.
.
.
+ [ ~~ ~
g 'p.z **cq
.
UNITE D STATES
d
s . ** '
o
NUCLEAR REGULATORY COMMISSION-
1
^
- y %.
REGION IV
I_o-
.
,
$4
y
611 RYAN PLAZA DRIVE, SUITE 1000
- 5
ARLINGTON, TEXAS 76011
.....
November 22, 1977
Docket Nos. M
"50-368
'l
Arkansas Power and Light Company
.
ATTN: Mr. William Cavanaugh III
Executive Director of Generation
'-
and Construction
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
l
,
4
1
This refers to the inspection conducted by Messrs. E. H. Johnson, R. G.
i
Spangler and J. E. Gagliardo of this office on November 2-4, 1977, of
j
activities authorized by NRC Operating License No. DPR-51 and NRC
j
Construction Pennit No. CPPR-89 for the Arkansas Nuclear One, Units 1 and
2, and to the discussion of the findings by the inspectors with members
of your staff at the conclusion of the inspection.
Areas examined during the inspection include:
(1) review of test program
status; (2) fire prevention / protection controls; (3) review of preoper-
ational test results; (4) valve controls; (5) Unit 2 jumper and bypass
,
log; (6) preventative maintenance; (7) spent fuel pool wall surveillance;
(8) review of test procedures; and (9) battery service testing. Within
these are'.s, the inspection consisted of selective examination of
i
procedures and representative records, interviews with personnel, and
-
j
observations by the inspectors.
q
i
We have also examined actions you have taken with regard to previously
i
,
identified enforcement matters and unresolved items. The status of these
<
items is identified in paragraph 3 of the enclosed report. Two new
unresolved items are identified in paragraph 12 of the enclosed report.
Within the scope of this inspection, no items of noncompliance were
identi fied.
It was found, however, that certain of your activities were
in deviation with your consnitments to the Commission as set forth-in
- -
paragraph 3 of the enclosed inspection report. You are requested to
.
.
I
s
,-
O
&
8004140'll'7
i
aimenem
+e=
e-
e moe 4ee
'
.
~_.
_
. .
. .
. . . .
-
. . .
_
i
-
,
-
.
,
-
.
-s g
Arkansas Power & Light Company
-2-
November 22, 1977
s-
,
submit to this office within 20 days of your receipt of this letter, a
written statement in reply which includes:
(1) actions that you plan to
take to meet your commitments; and (2) the date when the above actions
will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimec that the
information is proprietary. The application should be prepared s,o that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
T
pleased to discuss them with you.
-l
Sincerely,
.
^
.l} $ Q?fo.(=~~~
'G. L. Madsen, Chief,
-
Reactor Operations and
Nuclear Support Branch
Encit,ure:
IE Inspection Report 50-313/77-20 &
50-368/77-24
-