ML19320A102

From kanterella
Jump to navigation Jump to search
Forwards AO 50-313/74-14
Date released: 11/30/2019 Download: ML19320A102


AO 50-313/74-14:on 741228,pinhole Leak Found on Upstream Pipe to Valve Weld RBV-77B.Cause & Corrective Actions to Be Determined.No Hazard to Public Health & Safety
ML19320A111
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/28/1974
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19320A111 (2)
AO 50-313/74-14:on 741228,pinhole Leak Found on Upstream Pipe to Valve Weld on RBV-77B.Caused by Temp Variables & Amount of Weld Matl.Weld Ground Out & Rewelded
ML19320A107
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/08/1975
From: Cavanaugh W, Phillips J, Reuter D
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19320A107 (3)
Forwards AO 50-313/74-14
ML19320A101
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/08/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: CASE E G
Office of Nuclear Reactor Regulation
References
Download: ML19320A101 (2)