ML19320A075
| ML19320A075 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/14/1978 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19320A076 | List: |
| References | |
| NUDOCS 8004140687 | |
| Download: ML19320A075 (2) | |
See also: IR 05000313/1978007
Text
,
.
,.
.
j,n aroug
~ NUCLEAR REGULATORY COMMISSION
UNITED STATES
g
.
g
o
[
[
o
REGION IV
\\g
3 ..
$
611 RYAN PLAZA ORIVE, SUITE 1000
'
'
- o
March 14, 1978
Docket No. 50-313
a
Arkansas Power and Light Company
ATTN: Mr. William Cavanuagh III
.
Executive Director of Generation
and Construction
Post Office Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and R. A.
Hermann of our staff during the period March 1-3, 1978, of activities
authorized by NRC License No. DPR-51 for the Arkansas Nuclear One, Unit 1
facility, and the discussion of the findings by the inspectors with
members of your staff at the conclusion of the inspection.
L
Areas examined during the inspection included:
(1)inserviceinspection
activities; (2) nondestructive examination program for surveillance of
the decay heat and reactor building spray stainless steel schedule 10
piping; and (3) modification of the decay heat stainless steel piping
system.
Within these areas, the inspection consisted of selectiva examination
of procedures and representative records, interviews with personnel and
observations by the inspector.
Within the scope of the inspection, no items of noncompliance were
identified.
'In acccrdance with Section 2.790 of the NRC's " Rules of Practice,"
1
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If the report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office within 20 days of the date of this letter, requesting
-
that such information be withheld from public disclosure.
The applica-
tion must include a full statement of the reasons why it is claimed that
8004140N
k
.
..
-
-
-
--
.
.
__ .
_ . . _ . . .. __
_
_
.
_
-
,.
.
.
,
A
k_,)
Arkansas Power & Light Company
-2-
March 14, 1978
s
the information is proprietary. The application should be prepared so
'
that any proprietary information iden+.ified is contained in an enclosure
to the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
.
Sincerely,
.
k.$ kcW
,
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
i
/'~'S
IE Inspection .;eport No. 50-313/78-07
i
\\s_/
'
cc w/ enclosure-
J. Anderson, Plant Superintendent
'
L. Alexander, QC Supervisor
.
T
!
.
9
a
O
v
J
.,
_
,
- _ _ . . ,
,
_ . _
_ , _ _ . _ _ _ _ - . ,
, -.
- . .- . .