Text
_.
~:
O n
1.
Abnormal Occurrence Report No.
50-313/75-1A
'2.
Report Date:
July 16, 1975 3.
Occurrence Date:
January 20, 1975 4
Facility:
Arkansas Nuclear One-Unit'l Russellville,. Arkansas 5.
Identification of Occurrencc:
Reactor Building Cooling Unit Service Water Outlet ES valve CV-3814 did not reach its full open position during surveillance testing.
~
- 6. - Conditions Prior to Occurrence:
Steady-State Power X
Reactor Power 2530 Sixth liot Standby Not Output 835 3;wo Cold Shutdown Percent of Full Power 98.5
?,
Refueling Shutdown Load Changes During Routine
[]i Power Operation Rout 2nc Startup s
Operation i'
Routino Shutdown
~0peration a
Other (specify) s.
7.
Description of Occurrence:
At_1745 hours an attempt was made to conduct a quarterly surveillance.
test on the Reactor Building cooling units,.per Operating Procedure 1104.33. Upon command to open, CV-3813 failed to clear its closed limit but CV-3815 responded properly. The valve was repaired and A0 report number 50-313/75-1 was transmitted. The alternate loop service i
water 1:,olation valves were stroke ' tested and CV-3812 responded properly,-but CV-3814 did not. Cause of. failure could not be immedia-tely determined.
r b'
8004110h h Flarch 4, 1975
'NSP-10, Rev. 2 Page 2 of 4
=
.n.
4 l.
g Abnormal Occurrence-Report No.
i,
- 8. : -Designation of Apparent Cause of 0ccurrence:
50-313/75-1A
[
Design Procedure ir-
. Unusual Service Condition i
bbnufacture i
l-Including Environmental j
Installation /
Construction
' Component Failure 1
i 0perator Other (specify).
X e
l Cause of failure is galling of the. metal between the valve stem and its i
upper. bushing.
4 4
i l
l i
i
- 1 9.
Analysis of Occurronec:
L See Abnormal Occurrence Report No. 50-313/75-1 dated 1/30/75.
i s
I 1
i i
1.
1 p
4 i ;
fi March 4, 1975 NSP-10, Rev. 2; Page 3 O f, 4 l
1:
I a
.,,w,N,"w-.a-,w0-w.,
.r w-vm,->-
-e
--n
,,-,,,N.,.--_,mu,,-,-a---,e u
e,.n-,,w.,,,wm-m,n--,-nuw-.e.,..
..,.+,..,.w.rw-n-a--r--mm-o,-an,,-nav.
<-~s LAbnormal Occurrence Report No.
50-313/75-1A 10.
Corrective Action:
The construction of these valves are butterfly type with a vertical stem of stainless steel with a stainless steel bushing on-each side of'the bdtterfly and there are no provisions for lubrication of the bushings.
1 Rue stem was polished to remove scratches and upset metal on its surface and the bushings were honed smooth. The bushings were lubricated with
- Fel-Pro N-1000, the valve was reassembled and verified operable.
P l
j-11.
Failuro Data:
r.
See Abnormal Occurrence Report No. 50-313/75-1 dated 1/30/75.
4 i
J r
1
+
1 51 arch 4, 1975 NSP-10, Rev. 2 Page 4 of 4 3