ML19319E253

From kanterella
Jump to navigation Jump to search
Requests Review & Comments of Encl Model Annual Operating Rept to Determine Whether Model Is Appropriate for Util 1976 Operating Rept.W/O Encl
ML19319E253
Person / Time
Site: Rancho Seco
Issue date: 12/01/1976
From: Rusche B
Office of Nuclear Reactor Regulation
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8004010528
Download: ML19319E253 (2)


Text

%

N cember 1,'lSib.

l D g

DISTRIBUTION: w/o encl.

Docket NO.: S'0-312.

CFcket M re>

g

}t NRC PDR m'

L PDR DEisenhut L

a(

- JU J

ORB #4 Rdg TBAbernathy

==

VStello JRBuchanan M

Sacramento Municipal Utility.

BCRusche ACRS (16)

.?

District EGCase Gray File

=

ATTN: Mr. J. J. Mattimoe KRGol.ler

==

Assistant-General Manager TJCarter

.=

and Chief Engineer RRei'd 6201 S Street RIngram P.~0. Box'15830 VRooney (2)

Sacramento, California-95813 DElliott F,

Attorney,-OELD Gentlemen:

OI&E(3)

Our review of past operating reports from nuclear power facility licensees t

has indicated wide variations in content and arrangement.

Since most power 1.

reactor facilities now have. consistent reporting requirements, we have pre-pared a model annual operating report and we are considering preparing a Regulatory Guide on this subject. The object of the Regulatory Guide would be"to assure consistent content and arrangement of facility annual ope rating ' reports. However,.until a Regulatory Guide is issued you might

=

find the enclosed model report useful, particularly with regard to the preparation of your 1976 annual operating report.

The enclosed'model annual report is the result of discussions held between the NRC staff, several licensees and the Atomic Industrial Forum.

Those who. reviewed the model report' agree that the usefulness of the annual

-operating reports would be improved if they are all arranged similarly and include ~ all the suggested infonnation.

For completeness, additional information may be included as desired.

Accordingly, I request you review the enclosed model annual operating report and-determine if it is an appropriate model for your 1976 annual operating

-report. lI would appreciate hearing from you on this matter and specifically I would appreciate. hearing whether you will submit your 1976 annual operating report in conformance with the enclosed model.

Sinc ely, Jn Ben C. Rusche, Director Office'of Nachar Reactor Regulation

Enclosure:

['

iAs stated cc: 1See page:2:

g3 ORB #4:DORr ORBf3:DM Ne'ik _fDO.R C0@#4 ww N,

VRooney[

'DElliott rni Q

~-12/[/76 12///76 12/ / /76 a

y._

4:=

0Qf

h.

_l e:

.= ~-

rs.

=:.

u=

-Sacramento Municipal Utility District w/o enclosure.

zj cc: David S. Kaplan, Secretary and

D General Counsel E

6201 S Street.

=1 Post Office Box.15830 Sacramento, California 95813

~'^

~ %

Business and Municipal Department g =;;

Sacramento City-County Library 828 I. Street

. Sacramento, California 95814 a-n'...

  • ./.U" $

s

  1. h hhT.

b

'l s.

m

^

. _ ~..

~

,4 e

e t

+mf y - -

-v-e eaw r.=-.

v t