ML19319E114

From kanterella
Jump to navigation Jump to search
Requests Submittal of Rad Position Limits Analysis Before Operation After Control Rod Interchange.Deficiencies Noted in Ejected Rod Worth Calculations.Submittal Required Not Later than 45 Days Prior to Operation Following Interchange
ML19319E114
Person / Time
Site: Rancho Seco
Issue date: 03/27/1975
From: Goller K
Office of Nuclear Reactor Regulation
To: Davis E
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8003310622
Download: ML19319E114 (2)


Text

.

r g

DISTRIBUTION Docket Files KK NRC PDR Local PDR KRGoller MAR 2 ? 1975 TJCarter Docket No.30-312 SVarga

~~

RAPurple VLRooney (29 SMSheppard ACRS (14)

Sacramento Municipal Utility District OEI'D ATT.i: Mr. E. K. Davis OISE (3)

General Manager D

El 6201 S Strect Post Office Box 15830 WQ O3 p-}

~

Sacramento, California 95813 Gentlemen:

b 3

Deficiencies have been identified in the ejected rod worth calculations on which your rod insertion limits are based.

Based on our review of infornation from MN, your present rod insertion limits are valid tmtil the time of control rod interchange, after which time potential ejected rod worths greater than 1% Ak/k naf result when operating with your current Technical Specifications and your present fuel cycle.

i;efore you plan to operate following control rod interchange, you are requested to submit either:

(1) results of analysis and/or expericent which show that your existing rod position limits assure that the maxinum ejected rod worth is less than allowabic licits (Technical Specification 3.5.2.3) after control rod interchange occurs, OT (2) revised rod position limits in the forn of proposed i

Technical Spccifications with supporting anclysis which assure that the :axittc. ejected rod worth is less than allowable liaits (Technical Specification 3.5.2.3) after l

control rod interchange occurs.

If Technical Specification chanr,es are required, your subnittal should he received by the Nocicar Regulatory Comission not Inter than 45 days before you plan to operate following control rod interchange.

Sincerely,

.1 Ori;;inal Signed by Karl Gomr Karl R. Coller, Assistant Director

}

for Operating Reactors hy

w. u w..

u

.a

s..m n.,. n.a cc: _ see. ne xt-. -page.

'pl0%._.. RL :0R B #1-, :.'..RL:0R _.

1 orr'c<

  • RAPurp1'c'. #

KRGoller VLRooney:d e

.u. ~ - s

  • 3/27/75 1/D/. 75

... 3...A., 7../ 7. 5...- -

O.TE b s.._,

. ~.. - -

um AIC.315 tRev. 9 53) AECM 0240 W u. s. oovenwsw? enantino orric :, re.sas. tee

~8 310 f yf. j

Sacrancato !!anicipal litility District ffarch 27, 1975 cc: David S. Kaplan, Secretary and General Counsel 6201 S Street Post ' Office Box 15S30 Sacramento, California 95S13 Business and.!unicipal Department Sacramento City-County Library 82S I Street Sacramento, California 95S14 D

7 D

a bs S o

33 53 L !)G

.l

- 1 1

l 1

l L