ML19319E048

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-312/70-02 Re Mgt Meeting Subsequent to Initial QA Insp.Deficiencies Noted Have Been or Are Scheduled to Be Corrected
ML19319E048
Person / Time
Site: Rancho Seco
Issue date: 03/24/1970
From: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319E049 List:
References
NUDOCS 8003310515
Download: ML19319E048 (1)


Text

_.

I MAR Z4 8 I

J. 7. O'Reilly. Chief. Beester Inspecties and Enfersammat Brameh

?

Bivision of Compliamee SACRAWNIO ME1CIPAL WEILIIT BIETRICT (EAERO SECO) - DOCERT NO. 50-312 1he emelesed report of the managemsat meeting osaduated subesgnent to the initial gaelity soeuranse inopostica of the subject facility.

4 is'treammitted for infesumties.

The 11sensee's senter -& representatives were receptive to the -= ande by Cog 11anse.

.1 The defistemeias identified daring the initial plity assurance in-

-j speettom have been er are e t=J to be promptly eerrested. SWR j

resently made a gestity asemesase audit of 34W (WSS supplier) and

)

dete M =ad that the BEN % Program for Esasho Sees prodmets was elese to the ABC's S Criteria. S C indicates it will take every possible step to assure that the presadores esatataed in its % lesanal are applied to 34E 9

- }

i J. B. Bandersen Semier Cemetruction Engineer Divisism of Cong11ance Baeleeures CO Ept Rom 50-312/70 2 es w/emelt 4

E. E Case. MS (3)

F. A. Igorris. EEL

a. s. nord, nas (2)
a. sereams, ans (2) 1 m ?.0
3. J. Showbelt. E L (2) 0 F. News. ERL.

Wb

5. E Eirkmee. C0tI.

J. G. Davis. CO:II 2

q<

A

s. a. orter..CO: u I 1"u 3u'@;1 La B. I. Walker, CetIV E. W. Smith. CO V R. T. Dodds. C0tV RES File 9
  • gD I Ob[

1 /

l

[

__C 0 [j CO CO ornc >

?

FLiederb ch:alc JBHe\\ V m JP(M[

erso

..2[19.[.7.0.....

.2/20[h0 3/.40/.70 k

oArt >

Forse AEC-St. (Rev. 9-53) AECM 0240 aa se,s.., peerine arrica i sees e-e-e-ee, v

ew-,-,,

-e-

._-,,_,__,,-a

--_--w,'ww-