ML19319D858
| ML19319D858 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 03/15/1973 |
| From: | Rich Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| Shared Package | |
| ML19319D859 | List: |
| References | |
| NUDOCS 8003260943 | |
| Download: ML19319D858 (2) | |
See also: IR 05000312/1973001
Text
.
-
.
,
,
,.
.A
g.
4
UNITED STATES
1
'
V
ATOMIC ENERGY COMMISSION
DIRECTOR ATE OF REGut.ATORY OPER ATIONS
,
,
REGION V
l .j (
' j.
i
2111 B ANCROFT WAY
,
BER KELEY. C A LIFO R NI A 94704
, , , , , , , , , . , , , ,
.. ....
. MAR 1 5 1971
,
Sacramento Municipal Utility District
Docket No. 050-0312
P. O. Box 15830
-
Sacramento, California 95813
Attention:
Mr. John J. Mattimoe
Assistant General Manager
,
Gentlemen:
This refers to the inspection conducted by Ifr. W. G. Albert of this office
on February 28 and March 1-2, 1973 of activities authorized by AEC Construction
Permit No. CPPR-56 and to the discussion of our findings with Mr. D. G. Raasch
and other members of your staff at the conclus'on of the inspection.
The inspection was an examination of activities related to your preoperational
testing program. Within this area, the inspection consisted of selective
examinations of, procedures and representative records, interviews with
\\
project personnel and observations by the inspector. An allegation
regarding improper painting practice was also discussed during this
'
inspection.
1
No violations of AEC requirements were identified within the scope of this
inspection.
It is our understanding from this inspection that you intend to take the
following actions:
1.
Management systems which allow final approval of test procedures without
completion of all sections of the procedures will be examined to
determine how more positive controls can be established.
2.
Audits will be performed on a weekly basis until a determination can
be made regarding the substance of quality related items in a letter
received by the AEC alleging poor painting practices at Ranchv Seco.
We will c'xamine .your actions on these items at the time of our next
inspect 1on.
U
.
8003260
b
^
..
.-
. _
-
-
f.h .
.
- - -
,
d '.'
<
.
Sacramento Municipal Utility Dist.
-2-
MAR 1519U
.
Attached to this letter is our inspection report.
In accordance with
,
Section 2.790 of the AEC's " Rules of Prnctice," Part 2, Title 10, Code
i
of Federal Regulations, a copy of thin 1ctter and the enclosed inspection
~
,I~ report will be placed in the AEC's Public Document Room. If this report
,
,
contains any information that you believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days
+
,' , of the date of this letter, requesting that such information be withheld
i from public disclosure. 11te applicatioti miist include a full statement
of the reasons why it is claimed that the information is proprietary.
The application should be prepared so that any proprietary information
,
identified is contained in an enclosure to the application, since the
i
' application without the. enclosure will also be placed in the Public
Document Room.
If we do not hear from yoit in this regard within the
,
'
specified period, the report will be placed.in the Public Document Room.
.
.
Should you have any questions concerning this inspection we will be glad to
,,
'
discuss them with you.
,
Sincerely,
.
~
'
1
,
i,
j
R. W. Smith
i
Director
!
i
!
Enlosure
a/s
'
t-
cc w/o enclosure:
'
R. J. Rodriquez, SMUD
l
V. P. McMahon, SMUD
{.
'
s
l'
bec w/o enclosure:
I
R0 Chief, Operations Br.
Directorate of Licensing (4)
4
-
l
RO:H
4)
'
-
- -
DR Central Files
i-
GC
~ 7 5
'
,
E:
n'v
.
.
.
9. ..C:
.
.::J.:: -
>
g
'
'
.
v)
i
.
.
O
r-
t
,.,-
,
, - - - -
n
-:,,-
m.,m-,
-->--ea-yw-