ML19319D823

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-312/75-01 on 741227,750114-17 & 24. No Noncompliance Noted
ML19319D823
Person / Time
Site: Rancho Seco
Issue date: 02/12/1975
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19319D819 List:
References
NUDOCS 8003250814
Download: ML19319D823 (2)


See also: IR 05000312/1975001

Text

___ _ _ _ _ _ _ - - - _ _ - _ _ _

UNITED STATES

,

'

O'*

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202. WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

'

WALNUT CREEK. CALIFORNI A 94596

FEB 121975

,

Sacramento Municipal Utility District ~

Docket No. 050-0312

P. O. Box 15830

Sacramento, California 95813

Attention: Mr. J. J. Mattimoe

Assistant General Manager and Chief Engineer

,

Gentlemen:

This refers to the inspection conducted by Mr. M. H. Malmros and other

members of this office on December 27, 1974 and January 14-17 and 24,

1975 of activities authorized by AEC License No. DPR-54, and to the

discussion of our findings held by Mr. Malmros with Mr. J. J. Mattimoe

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

3

views with personnel, and observations by the inspector.

As indicated in the enclosed inspection report, the corrective action

'

described in your letter of December 30, 1974, in response to our letter

.

of December 10, 1974, was verified and we have no further questions at

this time. Additionally, receipt of your letter dated January 17,1975,

sent in response to our letter of December 27, 1974, is acknowledged. The

corrective action which you have described will be verified during the next

'

scheduled inspection.

.

No violations of AEC requirements were identified within the scope of

this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

i

2. Title 10, Code of Faderal Regulations, a copy of this letter and the

'

enclosed inspection report will be placed in the NRC's Public Document

i

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

'

this office, within 20 days of the date of this letter, requesting that

.

$

e

)

U?g.19$

. ...

,

t

-

.-

.

.

-

Sacramento Municipal Utility Dist.

-2-

E310 f3

such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is cla med that the

i

infomation is proprietary. The application should be prepared so that

any proprietary infomation identified is contained in an enclosu, e to

the application, since the application without the enclosure will also

i

be placed in the Public Document Room. If we do not hear from you in

this regard within the specified period, the report will be olaced in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

Ud& M m m

R. H. Er- -

,

R. H. Engelken

Director

Enclosure:

O

IE Inspection Report flo. 050-0312/75-01

g

,

cc w/o enclosure:

R. Rodriguez, S*1UD

'

L. Schweiger, S!4UD

DISTRIBUTION:

bec w/o enclosure:

IE Chief, FS&EB

IE:HQ (4)

RL (4)

%s

NRC Central Files

PDR

Local PDR

NSIC

DIIE

State of California

.

,

h

L)

l

.

.

- . , * - , ,

1

,. -

4-

,