ML19319D543

From kanterella
Jump to navigation Jump to search
Forwards Duplicate Original of Util Re Facility Fuel Loading,Structural Integrity Test & Startup Schedule. W/O Encl
ML19319D543
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/23/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8003170665
Download: ML19319D543 (1)


Text

._.

2 c r>%,

,r

  • 1: Q;'q iu, W;r-3-E 1, ; d
c. [' ?_' [,.. v V g,.- G (i: t.

p f.;.c e t g C.S 40 t

( s.

u w. c et Florida Power September 23, 1976

~

Mr. John Stol:

. Branch Chief o

~ '_'J :

Light Wa+,:r Reactors Branch I Division of Project Management

'.2 s,

U.S.

Nuclear Regulatory Commission

\\f;

,,g '

y Washington, D.C.

20555 b

4' V

%. '7 3 f/

In Re:

Florida Power Corporation Crystal River Unit #3 Docket N p 0-302

Dear Mr. Stolz:

We attach a duplicate original of our letter to you dated Septe W 076, rclatiTe-te-our. schedule of activities at Crystal River #3, fuel loading, SIT and start-up.

The discussion yesterday was very productive in spite of the letter not having been received.

This original will take the place of the copy we used for discussion purposes.

Please advise of any further requirements.

Very truly yours, s

J.

Rodgers Asst. Vice President JTR/iw Attachment.

g.

8008170 S S-

,,9 General Office 3201 Tniny-founn street sou:n. P O Box 14042.5: Petersburg F6onca 33733 813-866-5151