ML19319D542
| ML19319D542 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/05/1972 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8003170664 | |
| Download: ML19319D542 (2) | |
Text
,m AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
3144 FROM:
DATE OF DOC:
DATE REC'D LTR MEMO RPT OTER Florida Power Corporation St. Petersburg, Fla.
33733 6-5-72 6-9-72 x
J. T. Rodgers TO:
SENT LOCAL PDR X
R. C. DeYoung 1
CLASS:
@PROPINFO INPUT NO CYS REC'D DOCKET NO:
1 50-302 DESCRIPTION:
ENCLOSURES:
Ltr re our 6-1-72 ltr... Advising that info pertaining to Babcock & Wilcox topical rpts regarding application for license will be
' ( Y " ' '" ]- ]
cubmitted by 7-3-72...
PLANT NAMES: Crystal River, Unit #3 FOR ACTION /INFORMATION 6-9-72 rht BUTLER (L)
KNIEL(L)
VASSALLO(L)
ZIEMANN(L)
KNIGHTON(ENVIRO W/ Copies W/ Copies W/ Copies W/ Copies W/ Copies P
CLARK (L)
JSCHWENCER(L)
H. DENTON CHI'IWOOD(FM)
W/ Copies W/4 Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
STOLZ(L)
SCHEMEL(L)
DICKER (ENVIRO)
W/ Copies W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION
(# REG FILES)
SfELLO-L VOLLMER-L
/ REG OPER (2) S LANGE-L GRIlES-L BROWN-L L/A WR OGC-RM P-506 PAWLICKI-L GAMMILL-L WILSON-L L/A WR MUNTZING & STAFF THOMPSON-L KNIGHTON-ENVIRO KARI-L L/A BWR 4GIAMBUSS0-L TEDESCO-L DICKER-ENVIRO SMITH-L L/A BWR BOYD-L-BWR LONG-L PROJ LDR ENVIRO:
GEARIN-L L/A BWR 4DEYOUNG-L-WR LAINAS-L DIGGS-L L/A MULLER-L-ENVIRO SHAO-L SALTZMAN-IND.
TEETS-L L/A SKOVHOLT-L-OFER BENAROYA-L MCDONALD-PLANS WADE-L L/A ENVIRO KNUTH-L MORRIS-RO NUSSBAUMER-FM BRAITMAN-A/T MACCARY-L DUBE-L SMILEY-FM HARLESS-ENVIRO SCHROEDER-L E. CASE-L P. DOLLINS-L
/ HENDRIE EXTERNAL DISTRIBUTION I -LOCAL PDR Crystal River, Florida 1-SAN /LA/NY--PDR l
l-IYfIE-(LAUGHLIN) 9-NATIONAL LAB'S 1-CHIEF WATER REACTORS l
l-NSIC-(BUCHANAN)
ANL/ORNL/BIML l-RD....E. HALL F-309 GT l-ASLB-YORE /SARYE 1-R. CARROLL-0C, GT WOODWARD /H. Sr.
1-R. CATLIN, A-170, GT 1-C. MILES-C-459, GT l-CONSULTANf' S 16 CYS ACRS-HOLDING hMr./BLUME/AGBABIAN 1-DR. GERALD S. LELLOUCHE BROOKHAVEN NATIONAL LAB 8003170 f //
~
FLORIDA POWER C O R P 0 H ATION a
en sr. Perzasuuno rtontoA
/
A N
'~r Ndk A # k.$
\\
June 5,1972-ld [m[
(.g 5
,x
_ igu! L "
Filo Cy.
S,9
[
.5., y (17 R
- .sd c
,3 f,A A
N/.
D 'N s '.
Mr. R. C-DeYoung A
'N Assistant Director for Pressurized Water Reactors
'(Q Directorate of Licensing D'
United States Atomic Energy Commission Washington, D.C.
20545 Re:
Florida Power Corporation Crystal River Unit #3 Nuclear Generating Plant Docket No. 50-302
Dear Mr. DeYoung:
This is to respond to your letter of June 1,1972 which requested Florida Power Corporation to furnish a current compilation of appropriate Babcock & Wilcox Company topical reports which support our application for an operating license for Crystal River Unit #3 Nuclear Generating Plant.
Florida Power Corporation will respond by July 3,1972 as requested in your letter.
If the current compilation includes any B & W topical reports which are not now a part of our application, we will subsequently amend the application to incorporate them.
Please contact us if additional discussion or clarification of the above is needed.
Yours truly, e
I
' @'bC"l ws Asst.VicePr[esident J
Rodgers
& Nuclear Project Manager JTR:prt
/#
9 CCCI:ET:3 l'MEC
[1 W
JUfi,
1972 -
0-k2
':;"t/JH(
.;L COT'ON A
\\
e
. 01ET CLEM 3144 i M.
th,
..