ML19319D481

From kanterella
Jump to navigation Jump to search
Amend 30 to OL Application Revising FSAR & Suppl 1 in Response to a Schwencer 730725,30,0403 & 27 Ltrs.Also Updates Topical Rept Ref to Include BAW-1397, Facility Fuel Densification Rept
ML19319D481
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/21/1973
From: Rodgers J
FLORIDA POWER CORP.
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319D478 List:
References
NUDOCS 8003170608
Download: ML19319D481 (5)


Text

_ - -.

s Regulatory File Cy.

Rscened mLtr Mted 2*2 0*7 -

BEFORE THE UNITED STATES ATOMIC ENERGY C0f1 MISSION AMENDMENT N0. 30 TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY DOCKET N0. 50-302 Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, applicant for an operating license and construction permit for Crystal River Unit 3 Nuclear Generating Plant, hereby amends its Application by the filing of Amendment No. 30.

Amendment No. 30 consist: of revised pages to the Final Safety Analysis Re-port and Supplement No.1 contained therein. These revisions are in response to the Requests for Additional Information made by the Division of Reactor Licensing in the letters dated November 20, 1972, April 3, 1973, April 27, 1973, July 25,1973 and July 30, 1973.

This amendment to the Application contains no restricted data or other defense

~

information.

8003170 @ g

-e r-w

s e

e Arrandment No. 30 Page 2 Irl WITNESS WHEREOF, the applicart has caused its name to be hereunto signed by J. T. Rodgers, Asst. Vice President - Generation Engineering, and its corporate seal to be hereunto affixed by Betty M. Clayton, Asst. Secretary, thereunto duly authorized the 21st day of August,1973.

FLORIDA POWER CORPORATION by J. T.' Rodgers v Asst. Vice President -

Generation Engineering i

ATTEST:

/

l Betty M. Clayton Asst'. Secretary (CORPORATESEAL)

Sworn to and subscribed before me this 21st day of August,1973.

Ls

]

c y

.., 1

~

Notary Public My Comission Expires:

Notary Public State of Florida at Large My Comission Expires July 9,1974.

(fl0TARIAL SEAL) i

"N Docket 50-302 August 30, 1973 AMENDMENT No. 30 Regulatory File Cy FLORIDA POWER CORPORATION

"'"I"' "'" "' F 2 I-7

  • CRYSTAL RIVER PLANT UNIT 3 Amend =ent 30 to the Florida Power Corporation's Final Safety Analysis Report includes insert pages and responses to DRL inquiries.

The following sheets of the Florida Power Corporation's Final Safety Analysis Report are to be deleted and replaced with revised sheets dated 8-30-73.

Re=ove the following sheets:

Insert the following sheets:

Pages: Foreword - F-3 (Volume 1 only).

, Pages: Foreword - F-3 (Volume 1 only).

Pages: Table of Contents - v.

(Cne Pages: Table of Contents - v.

(One each in Volumes 1, 2, 3, h, 5, 6, 7, and each in Volumes 1, 2, 3, h, 5, 6, 7, Technical Specifications).

and Technical Specifications).

Pages:

1-39, 1-39a, 1 h3,'l h3a, 1-43b, Pages:

1-39,1-39a,- 1 h3, 'l h3a,'l h3b.

,1-44,-1-45,- 1 h6, 1 h6a, 1 h7,,1 48,- 1-49,

-l 4h,1 h9,1 h6# 1 h6a,147; 1 h8, 1-50, 1-51,-1-52, 1-53, 1-54,-1-55, 1-56,

- 1 h9,-1-50, 1-51, 1-52,-1-53,'l-Sh, 1-57, 1-57a,,1-58,-1-59, 1-60, 1-61, 1-62, 1-5 5, 1-56, 57, 1-57a, 1-58, 59, 65, and 1-66.

>1-60,-1-61,-1-62,-1-65, and'l-66.

Pages: iv,-2-v '2-vii:-, 2-47 ;- 2 48, and Pages:

  • 2-iv, 2-v,~2-viii, 2 47,'2-48, r

2-63 2-h8a, 2-63, 2-6h, 2-65, 2-65a, 2-65b, 2-66,- 2-67, and 2-68.

Figures: 2 h9 and%50.

Pages : - h-5, h-6, h-7., h-8,- h-35, and Pages: -h-55 h-6, h-6a, h-7,-h-8,

_ 4-36. 35, and*t-36.

Pages :

5-iv,-5-vii,- 5-29, 5-30,- 5-h9, 50, Pages : --5-iv,'5-vii,"5-29,'5-30, 5:497 50a, 5-50b, 5-50c, 5-6ha, and'5-6hb.

--5-50,-5-50a, 5-50b,'5-50c,-5-50d, 50e, 5-6ha,*5-6hb,'5-93,5-9h, and

,5-95

~

Pages :

6-iv,' 6-1; 6-2 r 6-11, 6-12,'6-16a, Pages:<'6-iv, 6-1, 6-2,'6-11,'6-11a, 6-27,and-6-28.

6-11b,- 6-12,'6-16a,'6-27, ane-6-28.

6-3A.

Figurest ~6-3A, 6-3B,~6-10, and 6-11.

Figure:

6 Pages: _7-2b, 7-2c, 7-9b, and T-10.

Pages:- T-2b,' 7-2c, 7-9b, and 7-10.

Figures:u 8-14, 8-15, and 8-16.

Figures:- 8-1k, 8-15, and'8-16.

Pages:- 9-iv,"9-vi, 9-33b, 9-34, and 9-55.

Pages : iv,- 9-vi, 9-33b,' 9-34, '9-55,

_ 9-56,,9-57, 9-58, and 9-59 --

Remove the following sheets:

Insert the followine sheets:

- Figures:

9-21, 9-22, and 9-23 Pages-ll-iv, 11-1,-ll-2,*ll-2a, ll-2b, Pages: 11-iv, 11-1,-11-2r 11-ka,-11-hb 11-4a, ll-4b, ll-he, 11-5, 11-Sa, 11-8, 11-kc, ll hd,- 11-5, 11-5a, 11-8, 11-9,

'll-9, 11-9a, and 11-9b.

11-9a, and 21-9b.

Figure:

11-1B.

Figures:" ll-1B and 11-1C.

Pages: 13 h1 and 13-42.

Pages: ~ 13 kl and~13 h2.

Pages: lk-52a and lh~52b.

Paces :- lh-52a, 1k-52b, and lb-52c.

Pages: 1hA-5 and lhA-6.

Pages: -lhA-5 and'lhA-6.

Pages: 'lhB-1, lhB-13, lhB-lh, lhB-21, and Pages:

lhB-i, lhB-13, lhB-lk, lhB-21, lhB-21a.

and 1hB-21a.

Supplement 1 Pages:

1,*h-7,h-13,-h-15,and"$'h.

Pages:

1,s-h-T,h-13 fI 15, C h, 6-5, 6-6, 6-7, and 7-8.

Supplement 1, Part 2 Pages: d 5, h-1, 6-1, 11-1, 15-1, 2, 15-3, and 15 4.

Technical Specifications (Section 15)

Pages: ivi 15-v,*15-82,15-113,'15-11b, Pages:. iv.; 15-v ~15-82, '15-113, and 15-151 (Figure 15-13). 114,and'15-151(Figure 15-13).

..