Supplements 720428 Response to NRC 720114 Request for Addl Info.Forwards Golder & Associates 1972 Rept on Foundation Problems.W/O Encl
ML19319D464
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/30/1973
From: Rodgers J
FLORIDA POWER CORP.
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003170593
Download: ML19319D464 (3)


Text

a AEC DIS

BUTION FOR PART 50 DOCKET MATI 6890-

\\L (TDiPORARY FORM)

CONTROL NO:

FILE: a FROM:

DATE 07 DOC DATE REC'D LTR MDiO RPT OTHER Florida Power Sorporation St. Petersburg, Fla. 33733 Mr. J.T. Rodgers 8-30-73 9-12-73 X

TO:

ORIG CC OTHER SENT AEC PDR XXX AEC 3 signed CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXX 22 50-302 DESCRIPTION:

ENCLOSURES:

Ler re our 1-14-72 ltr req ad('1 info on Report to Plorida Power Corporation on Fcundation Problems and trans the following...

Foundation Problems at the Crystal River Unit #3.

( Denotes: Mail control Form Only)

AC'C, op~m.,D w

PLANT NAME:

Crystal River #3 (22 en enc 1 rec'd) a,p%s y s ;

1'~

FOR ACTION /INFORMATION 9-12-73 "J B BUTLER (L)

!SCIMENCER(L)

ZIH4 ANN (L)

REGAN(E)

DO NOT REMoyb W/ Copies W/4 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

DICKER (E)

W/ Copies W/ Copies W/ Copies-W/ Copies GOLLUR(L)

VASSALI4(L)

KNIGHION(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

SCHEMEL(L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION m m m

D G FILX/

TECH REVIEW DENTON A/T IND

/AEC PDR HENDRIE GRIPES LIC ASST BRAI'IMAN OGC, ROOM P-506A SCHROEDdR GAMMILL DIGGS (L)

SALEMAN MUNI2ING/ STAFF MACCARY KASTNER GEARIN s*,)

CASE KNIGHT BALLARD V COULBOURNE (L*)

PLANS

~

GIAMBUSSO PAWLICKI SPANGLER LEE (L)

MCDONALD BOYD SHA0 MAIGRET (L)

DUBE MOORE (L)(BWR)

STELLO ENVIRO SERVICE (L)

DEYOUNG(L)(PWR)

HOUSTON MULLER SHEPPARD (E)

INFO SKOVHOLT (L)

NOVAK DICKER SMITH (L)

C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

IPPOLIT'O YOUNGBLOOD WADE (E)

REG CPR TEDESCO REGAN WILLIAMS (E)

.ILE & REGION (3)

LONG PROJECT LDR WILSON (L)

MORRIS LAINAS STEELE BENAROYA HARLESS VOLI1tER EXTERNAL DISTRIEUTION l$')

1 - LOCAL PDR 1 - DTIE(ABERNATHY)

(1)(2)(10)-NATIONAL LAB'S i-PDR-SAN /LA/NY 1 - NSIC(BUCluNAN) 1-R.Schoonmake r,0C,GT, D-323 1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/

1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. L4B WOODARD/"H" ST.

1-CONSULTANT' S 1-ACMED(WALTER K0ES"'ER

/16 - CYS ACRS NEkRBifi Sent to Goulbourne NEWMARK/BLUME/AGBABIAN RM-C-42 7-GT 9-12-73 1-GERALD ULRIKSON...ORNL l-RD.. MULLER..F-309 GT 8 003170 f93 g

aee A*Culatory e

e 30

@e FUa C -

e e

J Q

n.ae ggy Augus t 30, 197

_J3//

-. ~..,. -

s c :,,,,,

li AEg SEP y:

L

'n Director

. s, 4 F.%

g Directorate of Licensing TM Regulation

/[2*Tur C

N 1

ICc[Efh'$

h; a

N

<ycr W,\\

l(;

s IN RE: FLORIDA POWER CORPORATION

\\/b CRYSTAL RIVER NUCLEAR GENERATING PLANT

'k DOCKET NO. 50-302

Dear Sir:

Attached for the staff's review are twenty-two (22) copies of the following document:

Report to Florida Power Corporation on Foundation Problems, Nuclear Power Plant, Unit No. 3, Crystal River, Florida, H.Q.

Golder & Associates, LTD, Mississauga, Ontario, October,1972.

This is to complete our response to Item 2.10 of the Request for Additional Information attached to Mr. R.C. DeYoung's letter of January 14, 1972 to Florida Power Corporation. The first two documents requested under Item 2.10 were transmitted ~to you as an attachment to my letter of April 28, 1972.

In order to place the attached report in proper context, the following background information is provided.

The subsurface investigation, design, and grouting program was undertaken in March,1967 and culminated in completion of major grouting activities in December, 1970. Primary engineering responsibility for the grouting program was executed by Gilbert AsrSciates, Inc. including on-site participation and vcrification bf their engineers and geologists during active phases of the grouting program. Woodward-Clyde Associates provided geological consultation to the project and participated in on-site decisions and activities.

A six volume report entitled " Summary of Foundation Invescigation, Evaluation, and Construction for Crystal River No. 3" of the en*: ire scope of the grouting program was made available for review by the staff of the AEC Division of Compliance on December 20 and 21, 1971 for their evaluation of the program. This report encompasses the documentation of all reported site data and detailed analysis by both Gilbert Associates, Inc. and Woodward-Clyde Associates and provides all the information necessary for a complete evaluation of the grouting program.

cS90 General Office 3201 Tniny-rourtn strat soutn. P O Box 14042, St. Petersburg Flonda 33733 813-866-5151

/>

Director Directorate of Licensing Augus t 30, 1973 In addition to the activities of Gilbert Associates and Woodward-Clyde Inc., Florida Power Corporation requested Dr. H.Q. Golder, an acknowledged authority in foundation engineering, to provide his advise and personal counsel of the planning and execution of the grouting program to the FPC Nuclear Project Manager.

Dr. Golder was enlisted in the early stages of construction work and provided an expert overview of the ongoing activities directly to Florida Power Corporation management.

Dr. Golder's independent evaluation and judgments, which confirmed the adequacy of the grouting program, have been summarized in the attached report to Florida Power management. This report is available on-site and may be reviewed in conjunction with the multi-volume report previously evaluated by Division of Compliance staff members. Gilbert Associates and Woodward-Clyde Inc. have provided first and second level of technical competence for the program.

Dr. Golder's work and report was oriented toward providing an expertise which could be readily interpreted and utilized in the managerial control of the project.

Please feel free to contact ur if we can be of further assistance or if further discussion or clarification is n3eded.

Very truly yours,

/ p / 2l? (

-J pw J. T. Rodgers Assistant Vice President JTR/ns Enclosures

,.m-m