Responds to NRC Requiring Inservice Tendon Surveillance Program Equivalent to Reg Guide 1.35, Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures. Program Due 740430
ML19319D458
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/28/1974
From: Rodgers J
FLORIDA POWER CORP.
To: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003170587
Download: ML19319D458 (2)


Text

AEC DIS" *BUTION FOR PART 50 DOCKET MA g 1 (TEMPORARY FORM)

CONTROL NO: 1755 FILE:

FR(Df:

DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Florida Power Corp.

St. Petersburg, Fla. 33733 2-2 -74 3-4-74 X

J. T. Rodgers TO:

ORIG CC OTHER SENT AEC PDR X

A. Schwencer 1 signed SEN*r LOCAL PDR X

CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXX 1

50-302 DESCRIPTION:

ENCLOSURES:

Ltr re our 2-15-74 ltr.... advising that an amendment to the Crystal River Unit 3 FSAR to update the program description in Sec 5 2 5 2.

1.1 h and Tech Spec 15 4 2.1 as soon as ggTgggg possible and not later than 4-30-74......

PLANT NAME:

Crystal River Unit #3 FOR ACTION /INFORMATION 9-7-Th GC BUTLER (L) v$CIMENCER(L)

ZIDiANN(L)

REGAN(E)

W/ Copies W/ 4 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

DICKER (E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)

VASSALLO(L)

KNIGHION(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

SCHDIEL(L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION m

@ G FILE 3 TECH REVIEW DENTON A/T IND vAEC PDR

'1[ENDRIE GRIMES LIC ASST BRAI'DIAN OGC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)

SALTDIAN MUNTZING/ STAFF MACCARY KASTNER GEARIN (L)

B. HURT CASE KNIGHT BALLARD VDOULBOURNE (L)

~

pggg VGIAMBUSSO PAWLICKI SPANGLER LEE (L)

  • diCDONALD BOYD SHAO MAIGRET (L)

DtJBE w/ Input 4 00RE (L)(BWR)

STELLO ENVIRO SERVICE (L)

DEYOUNG(L)(PWR)

HOUSION MULLER SHEPPARD (E)

INFO SKOVHOLT (L)

NOVAK DICKER SMITH (L)

C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

B. KING DENISE IPPOLITO YOUNGELOOD WADE (E) i 4EG OPR TEDESCO REGAN WILLIAMS (E)

FILE & REGION (3)

LONG PROJECT LDR WILSON (L)

MORRIS LAINAS S. REED (L)

STEELE BENAROYA HARLESS VOLDfER EXTERNAL DISTRIBUTION 4h A - LOCAL PDR Crystal River, Fla.

1 - DTIE(ABERNATHY)

(1)(2)(10) NATIONAL LAB'S 1-PDR-SAN /LA/NY 1 - NSIC(BUCHANAN) 1-ASLBP(E/W Bldg,Rm 529) 1-CERALD LELLOUCHE 1 - ASLB(YORE /SAYRE/

1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB WOO.DARD/"H" ST.

1-CONSULTANT' S 1-AGMED(Ruth Gussman) 16 - CYS ACRS HOLDING NEWMARK/BLUME/AGBABIAN RM-B-127, GT.

l 1-GERALD ULRIKSON...ORNL l-RD.. MULLER..F-309 GT 800317n F M O

atory,Decket Fila

<g

$nch.

W Ar, s'&,

/g, c.,, %

3

+ny p

a_3 No

'4

'g 7,

"? vueu:y.j'

,?g y

((p!

g g

La x' ; >

s

~ :. -y';A,,.

wha m _

s +

u.

,Q yyM w'

L Florida s*- t v -

M u cpys" [,y v,

Poweon February 28, 1974 N,'

%.,p;,, g r

ca no n a r h

6 Mr. A. Schwencer, Chief N y " V.-

Light Water Reactors Branch 2-3 Directorate of Licensing Office of Regulation U. S. Atomic Energ" Commission Washington, D.C.

20545 In Re:

Florida Powei' Corporation Crystal River Nuclear Generating Plant Docket No. 50-302

Dear Mr. Schwencer:

This is in response to your letter of February 15, 1974. We were advised that we, as part of our Technical Specifications for Crystal River Unit 3, would be required to include an Inservice Tendon Surveillance Program not necessarily identical to, but equivalent to the program suggested in Regula-tory Guide 1.35, Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures.

An Inservice Tendon Surveillance Program will be established which is equiva-lent to the orogram suggested in Regulatory Guide 1.35. Technical Specifica-tion

  • will provide for inspection of twenty-one tendons, selected as ten hoop tendons, five vertical tendons and six dome tendons.

Inspection inter-vals of one year, two years, three years and every five years thereafter from the date of the original structural integrity test will be established.

Pre-stress loss, anchorage inspection, anchorage concrete inspection and conduit grease filler inspection will be perfomed on the selected tendons. One stressed wire will be withdrawn from each of three tendons and tensile and elongation tests performed. A report of each inspection will be recorded and significant deterioration or abnomal behavior reported to the Comission.

We are currently developing the revised Surveillance Program in accordance with Regulatory Guide 1.35 and the above information. We will provide an amendment to the Crystal River Unit 3 FSAR to update the program description in Section 5.2.5.2.1.1 h and Technical Specification 15.4.2.1 as soon as possible and not later than April 30, 1974.

Please feel free to contact us if further information or discussion is desired.