ML19319D376
| ML19319D376 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/26/1975 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003160211 | |
| Download: ML19319D376 (2) | |
Text
..
s NRC Di RIBUTION FOR PART 50 DOCKET..ATERI AL
" (TEMPORARY FORM) 13532 CONTROL NO.
FILE:
FROM:
Flordia Power Corp.
DATE OF DOC DATE REC'D LTR TWX RPT OTHER Crystal River J.T. Rodgers 11-26-75 12-3-75 XXX
-- TO:
ORIG CC OTHER SENT NRC PDR XXX XXX Mr. A. Schwencer 1 Signed 2
SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX
'3 50-302 DESCRIPTION:
ENCLOSURES:
Letter trans the following.......
Enlarged EI&C drawi,ng.......
(3 Cys. Received) q
' ]}'Q '{
O p
mm PLANT NAME: Crystal Rivee # 3:,
FOR ACTION /INFORMATION q 3 9_a_n BUTLER (L)
G6HWENCER (L) ZIEMANN (L)
REGAN (E)
RZID(L)
STOLZ (L) (CTT)
W/ Gepeee W/ Copies W/ Copies W/ COPIES W/ Copies CLARK (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies A-PAR R (L)
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies.
W/ Copies -
W/ Copies
--.-,,<.-e_
KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E)
LPM W/ Copies W/ Copies W/ Copies W/ copies INTERNAL DISTR'IBUTION
_ WFil h TECH REVIEW DENTON LIC ASST A/T IN D_..
T flRC PORO TIO SCHROEDER'
~ GRIMES R. DIGGS (L)
BRAITMANF -
6 OGC, ROOM P 506A MACCARY GAMMILL H,GEARIN (L)
SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER
- 4. GOULBOURNE (L6TO MELTZ
~',.csCASE PAWLICKI BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. RU3HBR00E(L)
MCDONALD MOORE (L)
HOUSTON ENVIRO S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr.)
SKOVHOLT (L)
RQSS DICKER S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
- POLITO KNIGHTON M. SLATER (E)
PETERSON P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
.- DENISE J. COLLINS REGAN S. TEETS (L)
KLECKER
> REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT. ;
$J1T.E & REGION (!)
BENAROYA V. WILSON (L)
WIGGINTON MIPC VO'.LM E R H ARLESS R. INGR 'M (L)
\\
H. DUNCyLia h
EXTERNAL DISTRIBUTION
[b(1h) WATIONAL LABS 1 - PDR SAN /LA/NY C ABERN 1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB 1 - CONSULTANTS 1 - G. ULRIKSON ORNL 1 - ASLB 1 - Newton Anderson NEWM ARK /BLUME/AG BABI AN
- ACRS HOLDING /SENT p.
~. ;.
800o160 M I h
->se..~ s a
O G G *fe
% ~..
p 4
~
t.
ee:
O
.see M
c a.o, o. n. o.P wer November 26, 1975
,,...3 IN>' d1E^.
Mr. A. Schwencer, Chief
/edV Director of Nuclear Reactor Regulation s
Branch No. 2-3
- 27 i,n ' (v'.
U.S. Nuclear Regulatory Commission Cf 91(? >'l n
Washington, D.C.
20555
-4 k'd 50% <
Re:
Florida Power Corporation
\\hr
- 4.
- Crystal River Unit #3 sA
- Docket No. 50-302 YdP 3._
'*LLEij -
Dear Mr. Schwencer:
In accordance with the procedure contained in your letter of May 6, 1974, concerning the distribution of supplementary de-tailed data, we are submitting three (3) copies of detailed EISC drawings.
The attached drawings (EC-206-017 and EC-206-041) reflect design changes providing an additional feed to each of the 120 volt A-C vital busses.
All new equipment is classified as Class IE.
The new transformer-regulator combination will be fed from existing Class IE power supplies as well.
The transfer to the new Class IE alternate source will be accom-plished through a manual transfer switch.
With this change, the requirement for plant shutdown within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as now stated on page 8-9 of the Commission's Safety Evaluation Report (SER) should be modified so it is only applicable after the loss of both Class IE feeds to the vital busses.
The necessary revisions to the Final Safety Analysis Report for Crystal River #3 to include this design modification will be filed with the Commission via Amendment No. 48 to the FSAR.
P1 ease contact this office if additional discussion is required.
Very truly yours, c$$ (?
J. T. Rodgers Asst. Vice President JTR/iw Attachments.
13532 Q