ML19319D307

From kanterella
Jump to navigation Jump to search
Forwards FSAR Per Doi .Requests That USGS Conduct Limited Review of FSAR to Determine Compliance of Gronting Measures Performed W/Psar & Amends.W/O Encl
ML19319D307
Person / Time
Site: Crystal River 
Issue date: 11/17/1971
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: Waldron H
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
References
NUDOCS 8003130958
Download: ML19319D307 (1)


Text

7

'<a w.

~

L

~

y-4 NOV 17 1971 Docket No. 50-302 Mr. Ilovard H. Valdron U. S. Geological-Survey l

Engineering Ccology Branch i

Denver Federal Center Denver, Colorado 80225

[

Dear Mr. Waldron:

1 i

In accordance with the understendings which vere reflected in l

the Departeent of the Interior's letter of March 20, 1964, to the Atomic Enerpy Co ncission, I am forwarding the Final Safety Analysin Report filed by the Florida Power Corporatir.n to operate the Cr,'ctal River Unit 3 currently under construction in Citrus County, 71orida, i

We-request th.tt the U. S. Geological Survey conduct a limited i

I review of the FSAR to detervatne that the grautin n:ensiirec.

reported aa t.aving been performed conforn to the grouting procrms which was described in the PSAR and amendwnts.

Sincerely, Original cigneg y, R. C. D* Young R. C. DeYoung, Anistant Director for Pressurize.d Unter Renctors Divisien of Reactor Licensing l

Enclosure:

FSAR Distribution Docket H. J. Yaulkner DRL Reading R. B. Minogue

[] g i

PWR-4 Reading A. T. Cardone jj (U

hjk l

WKaras (2)

U i

ASchwencer

.QRL:fWR'[,,

.DRL:WR-4 DRL ; AD/PWR.s, DRS

_ c;,

omer,

duikn.rece RMin$kde O.0.R.1.3.0.dT.

DeYoE.

Sch 'r)/3.cer

.r....... r.

............. 8.

..B w......... p.

sumwe>

11N571 11/$ 71 DAfr>

.11/_,/h71__....

11,s7/ 71

/

Form AEC-318 ;Rev. 9 53) AfCM 0240 o u s conrewev po v o essca

  1. -i s t [ v. 3