ML19319D307
| ML19319D307 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/17/1971 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Waldron H INTERIOR, DEPT. OF, GEOLOGICAL SURVEY |
| References | |
| NUDOCS 8003130958 | |
| Download: ML19319D307 (1) | |
Text
7
'<a w.
~
L
~
y-4 NOV 17 1971 Docket No. 50-302 Mr. Ilovard H. Valdron U. S. Geological-Survey l
Engineering Ccology Branch i
Denver Federal Center Denver, Colorado 80225
[
Dear Mr. Waldron:
1 i
In accordance with the understendings which vere reflected in l
the Departeent of the Interior's letter of March 20, 1964, to the Atomic Enerpy Co ncission, I am forwarding the Final Safety Analysin Report filed by the Florida Power Corporatir.n to operate the Cr,'ctal River Unit 3 currently under construction in Citrus County, 71orida, i
We-request th.tt the U. S. Geological Survey conduct a limited i
I review of the FSAR to detervatne that the grautin n:ensiirec.
reported aa t.aving been performed conforn to the grouting procrms which was described in the PSAR and amendwnts.
Sincerely, Original cigneg y, R. C. D* Young R. C. DeYoung, Anistant Director for Pressurize.d Unter Renctors Divisien of Reactor Licensing l
Enclosure:
FSAR Distribution Docket H. J. Yaulkner DRL Reading R. B. Minogue
[] g i
PWR-4 Reading A. T. Cardone jj (U
hjk l
WKaras (2)
U i
ASchwencer
.QRL:fWR'[,,
.DRL:WR-4 DRL ; AD/PWR.s, DRS
_ c;,
omer,
duikn.rece RMin$kde O.0.R.1.3.0.dT.
DeYoE.
Sch 'r)/3.cer
.r....... r.
............. 8.
..B w......... p.
sumwe>
11N571 11/$ 71 DAfr>
.11/_,/h71__....
11,s7/ 71
/
Form AEC-318 ;Rev. 9 53) AfCM 0240 o u s conrewev po v o essca
- -i s t [ v. 3