| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/13/1978 |
| From: | Nelson C Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003130918 | |
| Download: ML19319D278 (4) | |
Text
.
s.
_;; -~ ~ 3 7 =~ ~-- r,
~;-:..u.q w; q g -~2y 3:3 7 7 3-g z w /; g
- p
, _ y ;.* w: q., a.
~
7 s.-
- =...
.a:::.
. cm
.g 7 3k[.y.. Y jh[, [,M [ Jw
--[
3
.. M"w'.
~
a
+
,m 11
~-
~.
March 13, 1978
.m.. w
,. [; - _4yy
-i
. * }^ *3
~,,.
s
~,w : ;---
.v Do'cketNob50-302, 7 ll. Qy;jr {;-lc;..'.G h,.),' '*y
- % _. C ?'K *'
~ <
-y.
- n
.~
. q 'p,
c-ns ;lr;.u
@, ~ ^,
n
}. c; x %,, pj
,..,, ~.
S-..
,- ~ 1,
.f 7
^'
~
- ~_,
u ?., - -
e'
~
- - ~
~.
LICENSEE: FLORIDA POWER CORPORATIOft
~
CRYST!1 RIVER E!IT NO. 3' FACILITY: 1 x.-
SUBJECT:
SU. GARY 0F MEETING iiELD ON JANUARY 29,~ 1978 TO DISCUSS CONTAID'ENT TE!;D03 St.'RVEILLANCE b
9y 9'-
w h
a A list of attendccr is actached.
Jo o
d;
.a Dadground Dy letter dcted Novcber 21, 1977, FPC propered c cnwi:e to the CH-3 Technical Specifications ragmiing containrent tendon surveillance.
This chance would scacif'v minirm liftoff force per wire instead of per tendon,-while sti11 allowing tenden ferce to E tracked with time, and ITo~uTfplace a time dependent limit en wire iirtoff force to account for expected loss of pre stress.
During discussion with FPC
~and Gilbert Associates Inc., we requested verification that satisfactory surveillance results throughout the life of. the facility would assure
- that containment design criteria were' met.
In response FPC requested this meeting to present.a,furtherredified tendan surveillance program.
Discussions 6,. 7
.4
....m
- x
.f:
+
.g,,
FPC pro' pose' a subeillan[e progrim in which all tendons of a given d
type -(Hoop. Vertical and Dc:c) would be classified by groups of similite tendon prestress. This would; allow different liftoff forco li: nits for
, tendons with different nurbers of originally effective wires while continuing to pecify liaitts in terms of liftoff force per wire.
cPC:would use the nuecer of, effective wires in a tenden as determined w.
at initial. tensioning-to ' convert from observed tendon liftoff force to liftoff force per wire thuscaccurately indicating tendon degradation :. -"
throughout life.
.In addition, FPC proposed to classify sicme tendons cix as not eligible.for random selectionJof testing based on these -
~
tendons r.at fallina'ithin specified groups.
Furthemore, FPC.
~
w c
-c proposed a mininn liftoff' force Timit'for'each group which includes 7;y o m
.va'341/2 pertan,t'reTaration'toDacccunt for possible measurement errors.. *Mg
. am.r e m."w"=1 0.0 1 1 3_05 4 p g * " ~'49
% w:m.-
a.
% m.m u=
.w =
mm m.-
. -. ~ _ _..
l
~
\\
c
.9 3
-1 LIST OF A H ENDEES
\\
MEETING OF 1/29/78 k
Name Orcanization Chris Nelson NRC/ DOR Bert Simpson Florida Power i
Fred L. Moreadith Gilbert Associates Inc.
John C. Herr Gilbert Associates Inc.
James F. Fulton Gilbert Associates Inc.
Doug Giffin Florida Power Alex Gluckmann NRC/ DOR Consultant R. E. Shewmaker NRC/IE, RCI H. J. Wong NRC/IE, ROI Hansraj Ashar NRC/OSD K. Herring NRC/ DOR I
e G
e-y 1
- -.~:
p.
J MEETING
SUMMARY
DISTRIBUTIOQ ORBf4 Florida Power Corporation ATTN: Mr. W. P. Stewart Director, Power Production P. O. Box 14042, Mail Ston C 4 St. Petersburg, Florida 03733 et Fil L. Shao NRC POR R. Baer L PDR W. Butler ORB #4 Reading B. Grimes NRR Reading Project Manager E. G. Case Attorney, OELD V. Stello OI&E~(3)
K. R. Goller R. Ingram R. Fraley, ACRS (16)
T. Carter D. Eisenhut T. B. Abernathy J. R. Buchanan A. Schwencer D. K. Davis
- Meeting Summary File NRC Participant (s)
G. Lear R. Reid (A. Gluckmann, R. Shewmaker, H. Wong, H. Ashar, K. Herring)'