Forwards Final Rept 1927, Preoperational Integrated Leak Rate Test of Reactor Containment Bldg, Dtd 761210.W/o Encl
ML19319D237
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/09/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8003130863
Download: ML19319D237 (2)


Text

.

NRC FO" M 195 U.S. NUCLEAR REGULATORY f MISSION DOC KET NUMS E R S0-302 n.: u NRC. DISTRIBUTION FOR PART 50 DOCKET MATERIAL TO:J. STOLZ FROMFLORDIA POWER CORP.

DATE OF DOCUMENT ST. PETERSBURG, FLORDIA 12-9-76 J.T. RODGERS DATE RECElvEo 12-10-76 OLETTER ONOTORIZED PRCP~

INPUT FORM NUMBER OF COPIES RECElVED DORIGIN AL

$ UNCLASSIFIED OCOPY 40 DESCRIPTION ENCLOSURE LTR. TRANS THE FOLLOWING.......

REACTOR CONTAINMENT BUILDING PREOPERATIONAL INTEGRATED LEAK RATE TEST REPORT GAI 1927...

( 1 SIGNED CY. RECEIVED)

)

( 41 PAGES)

ACKNOWLEDGED DO NOT REMOVE l

PLANT HAME:

CRYSTAL RIVER S66

/W SAFETY FOR ACTION /INFORMATION rNvTun SAB 12-10-76 11SSIGNED AD:

ARRTcMPn AM.

/ BRANCH CHIEFr STOLZ unAMcu nnTrr.

PROJECT MANAGER:

PROJECT MANAGER:

/ LIC. ASST. :

MLM LIC. ASST. :

INTERNAL DISTRIBUTION

/ MEG FILD SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &

i

/ NRC PDR HEINEMAN TEDESCO ENVIRO ANAINSTE t

/ I&E m SCHROEDER BENAROYA DENTON & M117.T.vR OELD T.ATNAR GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH.

/ MIPC_

MACARRY KIRKWOOD ERNST CASE KNIGHT BALLARD

/ HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLESS PAWLICKI STELLO SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

CAMMILL BOYD ROSS EISENHUT STEPP

_ P. COLLINS NOVAK SHA0 HULMAN HOUSTON ROSZTOCZY BAER PETERSON CHECK BITTLER SITE ANALYSIS MELTZ GRIMES VOLLMER l

HELTEMES AT & I BUNCH SKOVHOLT SALTZMAN J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER

/ LPDR: CRYSTAL RIVER. FLA NAT. LAB BROOKHAVEN NAT. 1.AR_

W 3 LOP.'g,W

, 80031308C l

/ TIC:

REG V.IE ULRIKSON (O

/ NSIC:

LA PDR A AWf A U

12458 AFLB:

CONSULTANTS: VMI=w as a uy

, e i =

, =

i 7ACRS f CYS HOLDING / set,T

[L ( 20 APW 6

,j miv ov,~

A Mif* S f4WJ 104 #1.14 6

IC;; igg

Snee.

WW) s St s%wd

+

Yp h

BON

,/

C.. d#$

At2 p -y Power e

r conromanca

(

IN Decemb 8

occerno

~

q l

  1. ]

Of gg7g y g Mr. John Stolz Branch Chief e

/

Light Water Reactors Branch 1 g

p; g Division of Project Management

//

U. S. Nuclear Regulatory Commission g

N Wa'shington, D. C. 20555

Subject:

Crystal River Unit #3 Docket 50-302

Dear Mr. Stolz:

During the period of November 5 and 6,1976, the Crystal River Unit #3 reactor containment building was subjected to a pre-operational integrated leak rate, test. The purpose was to demonstrate an acceptable building leak rate at 49.6.Psig. The measured leakage was found to be 0.057% by weight per day which is well below the allowed 0.187% per day at 49.6 Psig.

We are today supplying to you 40 copies of our final ILRT report No. 1927 dated December 10, 1976 titled " Pre-operational Integrated Leak Rate Test of the Reactor Containment Building - Crystal River Unit 3" prepared by 7

Gilbert / Commonwealth.

This test was witnessed by NRC I&E Atlanta personnel and the preliminary

?

results reviewed with their personnel.

Should you have questions or require anything further, please advise.

Very truly yours, 9

J.

. Rodgers JTR:ejv Assistant Vice President cc:

Mr. Norman C. Moseley Director, Region II I&E Atlanta, Ga.

F j 't ^ RQ 4

I i

General Office 32o1 inirty-fourin street soutn. P.O. Box,p 14042, st. Petersburg. Florida 33733 813--866-5151

'~

. - _.