ML19319D147

From kanterella
Jump to navigation Jump to search
Forwards RO 77-4
Date released: 11/29/2019 Download: ML19319D147


RO 77-4:on 770101,during Cycling Demonstration of Normally Untestable valves,DHV-42 Control Switch Opened,Permitting Flow Path from RCS to Reactor Bldg Sump.Caused by Operator Negligence.Valve Closed & Caution Note Added to Procedure
ML19319D151
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19319D151 (1)
Forwards RO 77-4
ML19319D146
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19319D146 (2)