ML19319D133
| ML19319D133 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/21/1978 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19319D134 | List: |
| References | |
| NUDOCS 8003130703 | |
| Download: ML19319D133 (3) | |
Text
!
MY e
REGIJLATORY INFORNATION D.tSTRIBUTION SYSTEN (RIDS)
DI STiilEUTION FOR INCOi11NG MATERI AL 30-302 GEC: R E I D R li GRG. GTEWART LJ P DOCDATE: 07'21/7G NPC FL FUR DATE RCVD. 07/25/76 DOCTYFE. LETlER NOTARIZED: NO COPIES PECEIVED SUPJECT LTR 1 ENCL 40 rnFunr.UIn _, REPT DE:ICRIL.ING THE FERNANENT SOLUTION TO THE ECC; EN AL GPEAKS ANALYSIS @JCLEM FOR UNIT 3..
NOTARIZED 07/21/70 FLANT NAriE. CRYSTAL RIVER 1;0 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: k
+ 4 4 4 a
- 4 -or v>,+ 4 4 * *
- DISTRIEUTION OF TH13 t1ATERIAL IS AS FOLLOWS ******************
GEtJERAL DIGIRIDUTION FOR AFTER ISSUANCE OF UPERATIi40 LICENSE.
(DISTRICUTInN CODE A001)
'~OR AC110N.
CR CHIEF ORBJi4 BC**W/7 ENCL a.
INTERNAL.
, REG f I te *W /E NCL NRC PDR**W/ ENCL
'I & Et+U/J E.i cl L DELD**LTR ONLY HANAWR4 r U.: Ei; 'L CORE PERFOPi%N ?.F BR4+WeENCL AD FnR :. 7 E.
FROu:4 4W/ E i:CL El40INEERINO F R-*->W/ ENCL REACTOR iAFETY UR,- b ENCL FLANT SYSTEci:. LM<*U/ ENCL EEB44l4/ ENCL EFFL.UENT TREAT 9YS+4W/ ENCL J.
MCOOUCH4 +W/ ErK L EXTERNAL:
LPDR'S CRYST 6; RIVER, FL**W/ ENCL TERA **W/ ENCL NSIC44W KiJCL ACRS CAT DNi.3/16 ENCL DIEl RILUTION:
LTR 40 EiJC_ 39 CONTROL NER-
~
v.'..' '
t
? I j.C 2P+W
..~,.,_.1.-.m.
_.. m.,,m.-
THE Eno
_ _ _ 4,,. m.... _.. _...
8008130703
__: ~v~
.o s
'E5 9 ]
4.e K$h@ 04
- f
[7 di t
s d()@(g[j $$ -
R&gf) Gh '
h yG5;O.'*;d#
~
e.g
{I W.P STEWART, DIRECTOR ;
- POWER PRODUCTION -
' July 21,.1978 File: 3-0-3-a-3 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Mr. R. W. Reid, Chief Operating Reactors Branch #4
Subject:
Crystal-River Unit.3 Docket No. 50-302 Operating License No. DPR-72 ECCS Small Ereaks Analysis 1
Dear Sir:
Attached for your review is. a report describing the permanent solution to the ECCS Small Breaks Analysis problem for Crystal River. Unit 3.
-This report is in accordance with my letter of May 5,1978. -
The permanent solution is based on the B&W ECCS Evaluation Model (BAW-10104,-
Rev. 3) with revisions to the Wilson Bubble Rise Model-and the two node inner reactor vessel noding scheme.
It is realized that the Comission has not finished their evaluation of these revisions and' that a modified permanent solution may be required if the Commission does not approve all three revis-ions.
Please advise if 'further discussion is desired.
Sincerely, FLORIDA POWER CORPORATION l
~
fifJ cA j
W.P.-Stewart WPS/RB/ emf.1/3a
,mn % -
)
(
General Office 320 Tnirty fourtn street so6tn. P.O Box 14042. st.' Petersburg, Flonda 33733 813-866 5151 9
n
-e.
' STATE OF' FLORIDA.
~ COUNTY OF PINELLAS
. W.P. Stewart states that he is.the' Director, Power Production, of Florida Power' Corporstion; that he. is authorized on the.part of said company to,s'ign and file wit.1-the' Nuclear Regulatory Comission the inf ormation attached : hereto; and that all such statemenes made and matters ' set forth therein are true and correct to the best.of his knowledge, information and belief.
t h hu Lk L
W.P. Stewart Subscribed and sworn to before me, a Notary Public in artd for the State and County above named, this 21th day of July,- 1978.
1 Notary Public Notary Public, State of Florida at Large,
- My.Cemmission Expires:
July 25, 1980-4 4
w kn*
..m
,[__,