Text
.449,
$3 (yF e,
.m Florida Pow c.......e_r June 25, 1973 Mr. S. E. Kruesi, Director The Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, D.C. 20545
Subject:
Crystal River Plant - Unit #3 4
Docket No. 50-302
Dear Mr. Kruesi:
(tV)
Region II office of our possible involvement in a situation N
On June 20, 1973, Florida Power Corporation advised the DRO which could be considered reportable under Federal Regulation 10 CFR50.55(e). This situation involved incomplete documenta-tion in the weld filler material records for re ctor vessels, closure heads, and pressurizers fabricated by the Babcock &
Wilcox Company.
A report on the investigation of these records was submitted to the. Atomic Energy Commission by Babcock & Wilcox. A copy of the re. port, BAW-1403, identifying our involvement will be maintained at the Crystal River Unit #3 site.
Please advise if further information on tF s matter is required.
Very truly yours,
FLORIDA POWER CORPORATION l
/_
Richard E. Raymond Senior Vice President RER/fw g
cc: Mr. Norman Moseley
>]
,e i
<(
/
j Director, Region Il
~.J
]
l 3 C538 i
800s o4o 73 2 General Office 3201 Thirtyacurtn street soutn. P O Box 14042. St. Petersburg. Flonda 33733 813-866 5151