Notifies of Submission of BAW-1403,investigating Deficiency Re Incomplete Documentation in Weld Filler Matl Records for Reactor Vessels,Closure Heads & Pressurizer Mfg by B&W
ML19319D029
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/25/1973
From: Raymond R
FLORIDA POWER CORP.
To: Kruesi S
US ATOMIC ENERGY COMMISSION (AEC)
References
38538, NUDOCS 8003040952
Download: ML19319D029 (1)


Text

.449, - -

$3 (yF e,

.m Florida Pow c.......e_r June 25, 1973 1

Mr. S. E. Kruesi, Director The Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, D.C. 20545

Subject:

Crystal River Plant - Unit #3 4 Docket No. 50-302

Dear Mr. Kruesi:

N On June 20, 1973, Florida Power Corporation advised the DRO (tV) Region II office of our possible involvement in a situation which could be considered reportable under Federal Regulation 10 CFR50.55(e). This situation involved incomplete documenta-tion in the weld filler material records for re ctor vessels, closure heads, and pressurizers fabricated by the Babcock &

Wilcox Company.

A report on the investigation of these records was submitted to the. Atomic Energy Commission by Babcock & Wilcox. A copy of the re. port, BAW-1403, identifying our involvement will be maintained at the Crystal River Unit #3 site.

Please advise if further information on tF s matter is required.

Very truly yours ,

FLORIDA POWER CORPORATION

/_

l Richard E. Raymond l Senior Vice President RER/fw ,-