Forwards Insp Rept 50-312/71-04 on 710721-23.No Noncompliance Noted
ML19319C678
Person / Time
Site: Rancho Seco
Issue date: 08/09/1971
From: Spencer G
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C679 List:
References
14047, NUDOCS 8002210538
Download: ML19319C678 (2)


Text

_ _ - _

[

[

k UNITED STATES V

.[

l.?

ATOMIC ENERGY COMMISSION i

DIVISION OF COMPLIANCE PEGION V 2111 BANCROPT WAY BERKELEY, CALIFORNIA 94704 Tm.s - me,e4i-siz:

E'zT. 881 August 9, 1971 J. B. Henderson, Chief Reactor Construction Branch Division of Compliance, Headquarters SACRA} ENTO MUNICIPAL UTILITY DISTRICT (RANCHO SECO)

DOCKET NO. 050-0312 The Rancho Seco construction site was visited on July 21-23, 1971 for the purpose of conducting a routine construction inspection. No safety problems

)

or deficiencies were identified during the inspection.

l Subsequent to the inspection, SMUD informed Region V that they had received, reviewed and accepted B&W's engineering justification for the use of hot rolled steel that had not been normalized, in the assembly of the No. 2 steam generator. Also based on a discussion with M. W. Peranich, CO:HQ, it appears that the proposed documentation for the Class I carbon steel pipe will be adequate. We plan to review the disposition of both of these items s%

during the next inspection.

BMN8r/a/n

.jn,.~

G. S. Spencer Senior Reactor Inspector

Enclosure:

CO Rpt. No.71-004 by R. T. Dodds dtd 8/9/71 cc w/ enc 1:

E. G. Case, DRS-(3)

R. S. Boyd, DRL(2)

R. C. DeYoung, DRL (2)

D. J. Skovholt, DRL (3)

H. R. Denton.DRS (2)

A. Ciambusso, CO

.R. H. Engelken, CO L. Kornblith, CO

-Regional Directors, CO 4

DR Central Files v/

8002 210 f3[

Q

.e.

y' Ike 6

(

. O

[g-n/4,

DIVISION OF COM.PLIANCE 5.-

1 MONTHLY ~REPCRT FOR-AUGUST 1971 L

4 4

i -

.i '

'l j-

. l

~

~

Sacramento Municipal Utility District (Rancho Seco) - A-CO inspection was conducted on July:21-23.

The inspection sincluded a: review.of the QC procedures developed to control

. the welding-wortc, NDT1requireme'nts ' and documentation for the installation;of' Class I_ piping systems.

A-review of the

" records:and. observation of the. work in progress-indicated

.that the:QA/QC requirements.were being followed.

.A review of

-. outstanding items disclosed-that the use of-nonconformance s

. material in the shellLof'the steam generator-(July Monthly Report). appears toLhave'been resolved.

The licensee informed the-inspectors.that an evaluation.of the material used:had' been made, that it(appears'to be-acceptable, and will be approved;in accordance with appropriate design change procedure.

The licensee's~auditiof one'of his pipe vendors identified a

- nonconformance~concerning the traceability ~of-the pipe material.

_The pipe;has.been quarantined at the. site until certification, consistent ~with the'QA program,is' received.

No additional-deficiencies or safety items were identified.

-The. licensee, subsequent to the inspection, advised CO by

. telephone that the Teamsters struck-the~ plant on' August 2,

.andLother crafts are honoring their-picket line.

- -. ~.- :.-....