ML19319C474

From kanterella
Jump to navigation Jump to search
Submits Proposed ECCS-FAC Technical Review Input Schedule Changes
ML19319C474
Person / Time
Site: Crystal River, Davis Besse  Duke Energy icon.png
Issue date: 10/29/1975
From: Engle L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
NUDOCS 8002190924
Download: ML19319C474 (1)


Text

o A.

L s

~

,nV)

Distribution:

Docket File (2' LWR 2-3 File (2)

CCT 2 S 1975 LEngle Docket Nos. 50-302 and 50-346 ASchwencer EGoulbourne T. Novak, Chief, Reactor Systems Branch, Division of Technical Review THRU:

A. Schwencer, Chief, Light Water Reactors Branch 2-3, DRL SCHEDULE CHANGES FOR ECCS-FAC TR INPtfr FOR DAVIS 3ESSL, U'iIT 1 AND CRYSTAL RIVER, UNIT 3 RSC's submitted en October 24, 1975 and Octcher 28, 1975 for Davis 3 esse, Unit 1 and Crystal River, Unit 3, have proposed the follcwins; schedule changes for ECCS-FAC TR input.

  • hey are:

Blue Ecos From g

Davis Besse, Unit 1 12/12/75 03/05/76 Crystal River, Unit 3 11/03/75 12/03/75 S. Varga has been advised of the above changes.

Or;r,inal Sign 0d by L Engle Leon Engle, Project Manager Light Water Peactors Branch 2-3 Division of Reacter Licensinz ec:

S. Varga G. Ma::etia R. Baer

/

l RL,: LWR 2-3 RhCfgLWR2-3 EU

[encer__

pga,_

.u...=> w,-

,0gm g

_-.~.,m-m........._..........,.........._,..

800219o 7y

,