ML19319C474
| ML19319C474 | |
| Person / Time | |
|---|---|
| Site: | Crystal River, Davis Besse |
| Issue date: | 10/29/1975 |
| From: | Engle L Office of Nuclear Reactor Regulation |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002190924 | |
| Download: ML19319C474 (1) | |
Text
o A.
L s
~
,nV)
Distribution:
Docket File (2' LWR 2-3 File (2)
CCT 2 S 1975 LEngle Docket Nos. 50-302 and 50-346 ASchwencer EGoulbourne T. Novak, Chief, Reactor Systems Branch, Division of Technical Review THRU:
A. Schwencer, Chief, Light Water Reactors Branch 2-3, DRL SCHEDULE CHANGES FOR ECCS-FAC TR INPtfr FOR DAVIS 3ESSL, U'iIT 1 AND CRYSTAL RIVER, UNIT 3 RSC's submitted en October 24, 1975 and Octcher 28, 1975 for Davis 3 esse, Unit 1 and Crystal River, Unit 3, have proposed the follcwins; schedule changes for ECCS-FAC TR input.
- hey are:
Blue Ecos From g
Davis Besse, Unit 1 12/12/75 03/05/76 Crystal River, Unit 3 11/03/75 12/03/75 S. Varga has been advised of the above changes.
Or;r,inal Sign 0d by L Engle Leon Engle, Project Manager Light Water Peactors Branch 2-3 Division of Reacter Licensinz ec:
S. Varga G. Ma::etia R. Baer
/
l RL,: LWR 2-3 RhCfgLWR2-3 EU
[encer__
pga,_
.u...=> w,-
,0gm g
_-.~.,m-m........._..........,.........._,..
800219o 7y
,