ML19319C399
| ML19319C399 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/18/1976 |
| From: | Benaroya V Office of Nuclear Reactor Regulation |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002140782 | |
| Download: ML19319C399 (2) | |
Text
e l
h/
b DISTRIBUTION:
Docket File MAR 181976 NRR Rdng APCSB Rdng Docket No. 50-346
~ _ _ _..
Walter R. 3utler, Chief, Light Water Reactors Branch No. 4, PM APPROVAL TO OPERATE PRESElfr DESIGN DIESEL-GDIERATOR FUEL OIL ST0HAGE SYSTDI MT"IL INSTALLATION OF NEW DIESEL-GENERATOR FUEL OIL STORAGE SYSTDt MEETING NRC REQUIREMENTS IS COMPLETED BY JUNE 1977 Plant Name: Davis Besse Nuclear Power Station, Unit 1 Licensing Stage: OL Responsible Branch: LWR No. 4 Project Leader:
L. B. Engle The Auxiliary and Power Conversion Systems Branch has reviewed the Toledo-Edison letter dated March 8,1976, requesting per: mission to tecporarily operate the Diesel-Generator Fuel Oil Storage System for Unit 1 as presently designed. A new Diesel-Generator Fuel Oil Storage System neeting NRC requirements is acheduled for completion and operation in June 1977. Davis Besse, Unit 1 is presently scheduled for full power operation by the end of 1976 with commercial operation shortly thereafter.
In a meeting with the applicant at NRC on January 29, 1976, the Auxiliary and Power Conversion Systems Branch indicated that we would consider a request by Toledo-Edison to operate the present design of the Diesel-Generator Fuel Oil Storage System if the installation schedule of the new seismic Category I, Quality Group C fuel oil storage systen was reasonably close to the coc:mencement of power operation. Toledo-Edison's present achedule indicates the present j
fuel oil storage system nay be in operation about six nonths or less l
prior to installation of the new fuel oil storage system.
We believe that the probability of an accident requiring the necessity of a scismic Category I fuel oil storage syste:2 to be operational over thia short period of time la remote. We reco=cend that permission be granted to Toledo-Edison to use the present fuel oil storage system until June 1977.
Victor Eenaroya, Chief Auxiliary and Power
)
Conversion Systems Branch
]
Division of Systems Safety j
PS:AP B PS PS:APCSB DSS:PS-W 4rg ese.:.- -P.Matthews V. Benaroya R. Tedesco A.Ungard'/j o LL lI76 3LINL16..
Y 0
.-31]lhlL7.6... 31L L116 3
oes*
Foran AEC.)l3 (Rev. 9.))) AECM O240 C u. s. sovsnmu sm? asents=o ca rec ts neve.sas.see 8002140'/M
//
s.
Walter R. Butler MAR 181976 cc:
S. lianauer TA W. Mcdonald, MIPC R. Boyd, PM R. Heinetian, SS R. Tedesco, PS L. Engle, FM D. Fischer, APCSB P. Matthews, APCSL S. Varga, PM J. Glynn, PS i
A. Ungaro, APCSB f
i i
i l
orrec e >
.. =...
oars >
Foran ABC.)is (Rev. 9 55) A2CM 0240
- u. s. aovs==nea=v ege=te=a orreese sete.ese.s ee J
,