Responds to NRC Re Violations Noted in IE Insp Rept 50-346/77-08.Corrective Actions:New Cyberex Procedure Used for Tests on Class IE Battery Chargers & Welding Discrepancies Reviewed & re-inspected
ML19319C222
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/18/1977
From: Roe L
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19319C220 List:
References
NUDOCS 8002060787
Download: ML19319C222 (3)


Text

,

J TOLEDO A.,,.

%s EDi!3GRI LOWELL E. ROE u.~.....-

'*d*"

Docket No. 50-346 (4191 259 5242 February 18, 1977 Serial No. 221 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Toledo Edison acknowledges receipt of your February 3, 1977 letter and enclosed inspection report referencing the apparent noncompliances with fm NRC regulations.

These items resulted from the site inspection conducted

(

) by your office on November 30, December 1, 2 and 14-16,1976.

(.

Toledo Edison offers the follouing infomation regarding these apparent noncompliances, including corrective action and steps taken to avoid further occurrences.

Infractions A.

" Contrary to 10 CFR Part 50, Appendix B, Criterion XI, and the Toledo Edison Company Specification 7749-E-20, Section 16.3, 16.4 and 16.5, a test program was not established to perform tests to demonstrate that Class lE battery chargers and regulated rectifiers would perform satis-factorily in-service, after extensive rework and modifications had been performed.

(Paragraph 2, Section iii, Report Details)"

Toledo Edison has obtained from Cyberex a procedure for " Field Electrical Performance Test for Modified Battery Charger".

The Cyberex procedure identified specific retest requirements to assure the rework and modifi-cations had been perfomed on the battery chargers.

The procedure incorporated the method in which these tests were actually initially perfomed during late 1975.

Cyberex also has submitted results of field electrical perfomance tests and certification of rework and modifications in accordance with the procedure.

The test procedure, test results, and recertification have been reviewed and approved by Bechtel Engineering, m

and Toledo Edison Quality Assurance.

This documented test program provided

(

assurance that the battery chargers will operate properly in service.

8 0 02 0 e0 7f7 THE TOLEDO EDISON COMPANY EDISON PLAZA 3UD MADISON AVENUE TOLEDO, OHIO 43Cg g g

Mr. James G. Keppler 7

. Page Two

/ ] February 18, 1977 The above program was completed on February 17, 1977.

To preclude tue same conditions from recurring, all future battery charger equipment modifications will be more closely monitored by Toledo Edison in order to insure that proper documentation has been provided.

B.

" Contrary to 10 CFR Part 50, Appendix B, Criterion XVI and the Toledo Edison Company FSAR Chapter 17, Subsection 17.1.2.16, the licensee failed to ensure that adequate corrective action was taken by the Heating, Venti-lating and Air Conditioning Contractor, Lumm-Irsay relative to deficient items identified in audit reports.

(Paragraph 4.c,Section IV, Report Details)

During periodic TECo QA audits of Lumm-Irsay (L-I) in February,1975, Toledo Edison had identified discrepancies in the L-I Quality Assurance Program with respect to weld inspection and the inspection personnel oualification records of L-I QC Technicians.

The discrepancies identified in the L-I weld inspection noted a conflict between the weld inspection requirements of the L-I QA program and their welding procedures.

The L-I welding procedures stated that weld inspection would be accomplished in accordance with AWS D1.0-69, Section 6, while the L-I weld inspection procedure contained in Section 5 of the L-I QA Manual g "'s did not encompass all aspects of ANS Dl.0-69.

Since the requirements of g

)

the L-I QA Manual were being used, L-I revised the appropriate welding procedures to require that inspections be performed in accordance with their QA Manual.

The revised L-I welding procedures were approved by Bechtel Engineering in July,1975.

The L-I QC Technician referenced in your inspection report has been reassigned and is no longer in L-I QC.

A documented statement that the present L-I Field QC Technicians are qualified for their positions is on file and available from the L-I QC Supervisor.

TECo QA formally instructed Bechtel QC, on December 20, 1976, to increase the Bechtel QC surveillance of L-I welding and document their findings.

Bechtel QC Corrective Action Field Inspection Reports are generated to identify discrepant items and require corrective action to be taken to ensure satisfactory completion of rework.

In addition, TECo QA requested that Bechtel QC review past welding performed and inspected by L-I prior to December 20, 1976.

Due to discrepancies noted on the previous welding, L-I was directed the Bechtel Field Construction Manager to perform a rein-spection of welds on accessible seismic supports.

Bechtel Field QC is, and will continue to, reinspect the L-I reinspection on a random basis.

It is anticipated this reinspection will be completed prior to February 25, 1977, in the containment building.

Reinspection in all other areas will be completed prior to March 25, 1977.

O

\\vi O

h L.

.. -.... _ _ ~. ~...... - - - - - -.. - -. - - - _ _. -. - -... _.

u 4-

}_

Mr. James G. Keppler j

-Page Three February 18, 1977 1

L-I held a weld inspection training program on February 12, 1977 for 4

their QC personnel.

Yours very truly,

^

/,, -}