Responds to NRC Re Violations Noted in IE Insp Rept 50-346/77-16.Corrective Actions:Review of RO NP-33-77-2 Documented on 770628 & Administrative Procedure Re Control of Conditions Adverse to Quality Modified on 770712
ML19319C216
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/16/1977
From: Roe L
TOLEDO EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19319C213 List:
References
386, NUDOCS 8002060782
Download: ML19319C216 (2)


Text

%)

e-e L' /

was EDISON g

M M TOLEDO Docket No. 50-346 LOWELL E. ROE Vece PresMeet Scrial No* 386 I4191 PS3-5242 September 12, 1977 Mr. Gaston Fiorelli, Chief Reactor Operations Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road

~,,

Glen Ellyn, Illinois 60137

Dear Mr. Fiore11i:

Toledo Edison acknowledges receipt cf your July 13, 1977, Ictter and report enclosurc 77-16 referencing apparent noncompliance from Davis'-

Besse Nuclear Power Station Unit No. 1 commitments to the NRC.

These items resulted from site inspections conducted by your office on May 5, 16-18, 25, 31; June 1, 2, and 20-22, 1977.

Toledo Edison offers the following information regarding this apparent h

noncompliance, including corrective action and steps taken to avoid further occurrences.

Deficiency 1.

" Contrary to Section 6.5.1.S of the Technical Specifications, the violation of Technical Specification described in reportabic occur-4 rence NP-33-77-2 was not documented as having been reviewed by the Station Review Board."

The review of the reportable occurrence NP-33-77-2 was documented on June 28, 1977, and AD 1804 Reports Management was revised on August 19, 1977, to preclude reoccurrence.

2.

" Contrary to the approved Quality Assurance Manual and Criterion V of 10CFR50, AppenAix B, Administrative Procedurc AD 1807.00 was not completely adhered to in the processing of Deviation. Reports."

Administrative Procedure AD 1807, Control of Conditions Adverse to Quality was modified on July 12,1977,after a review of the process to clarify apparent awkwardness in the procedure.

SEP 1G 1977 l

l THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 1

8002060782 7_

<._7_,_,______.._.____._.._______._...__.______.

l

~

i i

i l

s.

Mr. Gaston Fiore11i 2-This is the first occurrence of this nature.

The logging and tracking

of Inspection Reports has been modified to insure an event of this nature

{

does not occur again.

l l

l Yours very truly, j

i-4 t

i t

j-l LER/JGE/ daw l