ML19319C184

From kanterella
Jump to navigation Jump to search
Ack Receipt of 741003 Interim Deficiency Rept Re GE 480 Volt Breaker
ML19319C184
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/24/1974
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001310591
Download: ML19319C184 (1)


Text

_

p UNITED STATES

,]

ATOMIC ENERGY COMMISSION i

i, g

y WASHINGTON. D.C. 20545 l

Our OCT 2 41974 The Toledo Edison Company Docket No. 50-346 ATIN: Mr. Lowell E. Roe Vice President Edison Plaza 300 Madison Avenue Toledo, Ohio 43652 Gentlemen:

Thank you for your letter dated October 3,1974, which forwarded a report pursuant to 10 CFR 50.55(e) regarding the Davis-Besse Nuclear Power Station Unit No.1 General Electric 480 volt breaker problems. Your report will be reviewed and evaluated and, should we require additional information concerning this matter, we will contact you.

Your cooperation is appreciated.

J Sincerely,

~

J hn G. Davis, Deputy Director for Field Operations

~

Directorate of Regulatory Operations

~

l f

s o oi slo Sy/

j

~

.sl l