ML19319C172

From kanterella
Jump to navigation Jump to search
Responds to AEC 720926 Request for Review of Seismic Equipment Failure Effect on safety-related Equpment.Design Mods Implemented,Upgrading Piping Sys.Same Valves Added Mitigating Water Flow Into Failed Sys
ML19319C172
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/26/1973
From: Sampson G
TOLEDO EDISON CO.
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C173 List:
References
NUDOCS 8001310530
Download: ML19319C172 (1)


Text

_

l ;3

('.f..

,, p p ~ a) s

)

LJ

.m: e

%./

.. s %}---.

i roteo0

- g q-EDISON a

. ~ s;r

...9 i

~z 6

GLENN J. SWPSCN ts., x., fy.f v c. pres.eene. pa.or s ' Q.:

M January 26, 1973 Mr. R. C. DeYoung, Assistant Directar for Pressurized Water Reactors Directorate of Licensing U.S. Atomic Energy Coc=ission Washington, D.C.

20545 Docket No. 50-3h6

Dear Mr. DeYoung:

Our October 30, 1972, letter in response to your september 26, 1972, request for Toledo Edison to review the Davis-Eesse Nuclear Power Station non-Class I (seis=ic) equip =ent that =ight potentially adversely affect the perfor=ance of safety-related equipment, pro =ised a further reply within 90 days. This

,[

l letter responds to that pro =ise.

's

,/

w/

A detailed review was made of non-Class I (seis=ic) syste=s and co=ponents to deter =ine whether failures could adversely affect safety-related syste=s and equip =ent by any of the following = odes :

1.

Falling of non-Class I (seismic) equipr.ent onto essential safety equip-

=ent.

Spraying of essential safety equipment due to non-Class I (seismic) co=-

2.

ponent rupture.

3.

Flooding of essential safety equipment due to non-Class I (seis=ic) co=-

ponent rupture.

This review has resulted in sc=e design =odificatiens to ensure that safety-

^#

related equip =ent vould not be adversely affected. Portions of the fire pro-2 tection piping have been upgraded to Class I (seis=ic) design and portions of

,Jj /

several other piping syste=s are being upgraded to Class I (seismic) design.

In certain areas, curbing is being added where water frc= potential ruptures

~

j might affect safety-related equipment at that or sc=e 1cwer building elevation.

d(

So=e valves, both autc=atic and =anual, are being added to certain piping

[

syste=s to prevent or =itigate flow of water into a failed syste=.

9J So=e portions of this review are still under study, but all design require =ents vill be established within 90 days.

I

[09,(?

n

~

I I

Yours very truly,

f., :

u/

p yp -

h COPY SEST REGION 3

/+,='

. ~ mt

-b THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISCN AVEN TCLEDO[ HIO 43652 caS:cd

(

l 8001310/ go j