N9C F He 195 u.s. NUCLEAR REGULATORY COMMIS3l!N DOCKbES - 3 c{b NUM!E a.n o NRC DISTRIBUTION FoR PART 50 DOCKET MATERI AL
, n TO:
FROM:
DATE OF DOCUMENT Toledo Edison Company 6/1/77 Mr. John F. Stolz Toledo, Ohio oATE RECEIVE o 6/6/77 Lowell E. Roe TTEn ONOTORIZED PROP INPUT FQ AM NUMBER OF COPIES RECEIVE D l $ l &k) C#b IGINAL C L ASSIFIE D p
O cop t.
OESCRIPTION ENCLOSU RE Amdt. to OL/ Change to Appendix A ech specs...Concerning Decay Heat Isolation valve Interlock Channels....
~,,,,
.-. ~ -
(1-P)
(2-P) q---,.,,---.
'~
' ' ~ * * ' "
PLANT NAME-g$O ' g Davis Besse Q-6 c
s u
RJL 6/8/77 0
@ h00 SAFETY FQR ACTION ANFOR*.1ATION
'E"UTnn
/ ASSIG"ED AD:
1/4.554 //6 AssTc'mn An.
3RANCil_CILT.EF r
_ < AzP / 2 nnANr t mivs.
_Jf.0Rc7 MANAGER:
8 f /< -
PROJECT MANAGER:
@///A LIC. ASST. :
/_LIC ASST. :
e
)
INTERNAL DIST3!SUTICN REG _ FIT "
SYSTE"S SAFETY PLANT SYSTEMS SITE SAFETY &
R HE I?."'"A N
/
TEDES_C0 ENVII'O A"A,1.YSTS n.-.
[ I & E ( "h)
SCHROEDER
/.
BEIM 0YA D"" TON & vntrt'
/ OELD
/
T.ATNAs GOSSICK & STAFF ENGINEERING
/
IPPOLITO ENVliLO__IECH -
MIPC MACAR_RY KIPJN00D ERNST CASE
/
BOS'.!AK BALLARD HANAUER
/, SI1NEIL OPERATING REACTORS SPANGLER HARLESS
/
PAWLICKI STELLO
/
(AJ A t h & + "'
SITE TECH.
PROJECT MANAGEMENT REACTDR SAFETY OPERATING TECH.
/
GAM} FILL BOYD
/. ROSS EISENHUT STEPP P, COLLINS
/
NOVAK SilA0 HULMAN HOUSTON
/. ROSZTOCZY BAER
~
PETERSON
/
CHECK BITI'LER SITE ANALYSIS MELTZ GRIMES
/
VOLLMER HELTEMES AT & I
/
BUNC_H SKOVHOLT SALTEMAN
'/,J. COLLINS R11TBTRG
/
KRECER EXTERNAL DISTRIBUTION CON TROL NUMBER g LPDR_; M G/,wfeed_O #
NA L LAB:
BR0fKilAVEN_NAT__ LAh TIC:
REG V.IE ULRIKSON E ftNL)
~
^
g5S'IC:
TA PDR
/
].
ASLB;..
CO'SULTANTS:
/ Oh A / $ I [)
ZACRS /b CYS
=r"' / SEJT M C/l 7 h
/
DV' t
v NXC F ORM 195(2 763
~
~..
$ aisr3 Fde pf3 TOLEDO
%mm EDISON Docket No. 50-346 LOWELL E. RCE v.ce Paes.oem s.c u.. :
....-.m June 1, 1977 am ass sua Serial No. 289 C
W ff -
'f,T's
\\\\
Director of Nuclear Reactor Regulation Attn:
Mr. John F. Stolz, Chief h
b i
g 197 # Z Light Water Reactor Branch No. 1
.gh
&((
Division of Project Management U.S. Nuclear Regulatory Commission
\\
U Washington, D.C.
20555
/
Dear Mr. Stolz:
- [.
The present Davis-Besse Nuclear Power Station, Unit No. 1 Technical Specifications, Table 4.3-2, are being interpreted by the Of fice of Inspection and Enforcement, Region III, to require that the Decay Heat Isolation Valve Interlock Channels be operational in Modes 1, 2, 3, 4 and 5.
In order to perform the Channel Functional Test and Channel Calibration, these interlock channels must either be made inoperable or result in the closure of the va.ves in the Modes 4 and 5 which results in the loss of the Reactor Coolant System overpressurization protection. This would be a violation of the requirements of 10 CFR 50, Appendix G.
It is desired to reflect on Page 3/4 3-22 of the Davis-Bh.,
Nuclear Power Station, Unit Nc. 1 Technical Specifications (Appendix A to Operating License NPF-3) that in Modes 4 and 5, performance of a Channel Calibration or Channel Functional Test on the Decay Heat Isolation Valve Interlock Channels will require that the interlock for one of the two decay heat isolation valves will be taken out of service to prevent closure of the valve.
It is, therefore, requested that the Technical Specifications be revised by the addition of a footnote as shown on the attached modified Page 3/4 3-22 of the Technical Specification. A safety evaluation for this requested change is attached and is a part of this request.
These changes are urgently required to permit continued progression of startup testing and your prompt action is requested.
Yours, vary truly,
-V fc ~.&/,///;kS~
/
/
LER.r w
Attach:
(1) Modifed Page 3/4 3-22 of Technical Specifications (2) Safety Evaluation THE TCLECO EDISCN CCVDANY EDISCN PLAZA 300 MACISCN AVENUE TCLECO, CHIO 43652
_T 'c _ t' W
e
_F :.
0,.. _
...J E
.. _.4' v..
- i. e, t_ u_.s : r. u-- -
g 5.
!!;iEhtC !. CliAtU;tLL
[
beca) Lei.t Isols tici. \\iive S
f(3)
" (3) 1, 2, 5, 4, 5 c.
- see 5;teci ficE ticr. Z.E.1.d. i f.
-.r.
t..
f.hdk'%
f_>h t.,
w U
(I) llanuel actuction st,1tches shall be tested et Icert once ce" 18 ror.ths derinc shutamen.
All etna circuitry este -iated t:itt. r,3nual screguardr cctuatico stiall receive c CliA!:3L FUf.CTIO :AL TEST at least or.ce per 31 davs.
(,, ) Ine C m..,i.t,
.cU..
h,,...i.
- -r,. snal3 1r.cludc excrciring tr.
transritter te ca; tyinc either va:curc or
..i
- nn ure t-the tr;'rcpric
- _ - t u cf th: t ra nst,a tte r
- 6.. e (3)
In Modes 4
(. 5, when Channel Calfbration or Channel Function Test surveillance is performed t he interlock for one of the two decay heat Isolation valves will be taken out of service.
DB-1 SAFETY EVALUATION FOR REQUESTED CHANGE TO THE DB NPS UNIT 1 TECHNICAL SPECIFICATIONS (App. A to License No. NPF-3)
Table 4.3-2 needs to be changed to allow the interlock on either DH 11 or DH 12 (not both simultaneously) to be taken out of service in Modes 4 and 5 while performing Channel Calibration or Channel Functional Test Surveillance Requirements.
Valves DH 11 and DH 12 must be open in Modes 4 and 5 to provide overpressurization protection to the Reactor Coolant System.
Sea the letters to the NRC with Serial Nos. 220, 260 and 271 which address the safety analysis for use of these valves.
The present automatic closure setpoint of 433 psig (Technical Specification requirement calls for a setpoint oft 413 psig) assures that these valves will not automatically close prior to the actuation of PSV-4849, which is set at 320 psig.
(See the letter to the NRC, Serial No. 271). Therefore the removal of the inter-lock from one of these valves during testing in Modes 4 and 5 will not affect the safety of the station.
June 1, 1977 1
i i
i
,