ML19319C109

From kanterella
Jump to navigation Jump to search
Forwards Meteorological Data Re Difference Between 740804 - 750803 New Tower Daa & 691201-701130 Old Tower Data,& Representativeness of New 740804-750803 Data Per NRC & 760129 Meeting
ML19319C109
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/23/1976
From: Roe L
TOLEDO EDISON CO.
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8001310472
Download: ML19319C109 (2)


Text

a

gnCpOnu 195

~

O.S. NUCLEAR REGULATORY CC S$;ON COCKET NUMIER 50-346 a.rel

/

NRC DISTRIBUTION FC PART 50 DOCKET MATERIAL TO:

FROM: TOLEDO EDISON COMPANY ATE cr oOCmT 2-23-76 MR W R BUTLER TOLEDO, OHIO OATE RECEIVED L E ROE 2-24-76

[ LETTER ONOTORIZEQ PROP INPUT FORM NUMOER OF COPIES RECEIVE) pAIGINAL NC LASSIFIE o 40 LJ COP Y DESCRIPTION ENCLOSU RE LTR, RE OUR 11-7-75.....TRANS THE (1) REPRESENTATIVENESS OF THE DAVIS-BESSE FOLLOWING.

METEOROLOGICAL DATA PERIOD 8 4-74 THRU 8-3-75 WITH RESPECT TO LONG-TERM.......

(2) EVALUATION OF TEMPERATURE LAPSE RATE DATA MEASURED AT THE OLD AND NEW ME' EOR 0 LOGICAL TOWERS AT THE DAVIS-3 ESSE..

D

,q-PLANT NAME: DAVIS BESSE 91 NOTE: DIST PER MR ENGLE 2-24-76 SEE R. PTS SMceT SAFF.TY FOR ACTION /INFORMATION ENVIRO

)C ASSIGNED AD :

DE, Young-((TR )

ASSIGNED AD.

iK BRANCH CHIEF :

l'A) h T t.E.R.

BRANCH CHIEF :

i PROJECT !!ANAGER:

PROJECT MANAGER :

X LIC. ASST. :

Rugggg.coK(LTR}

LIC. ASST. :

i INTERNAL DISTRIBUTION A 8EG FTT O SYSTEMS SAFETY PTriT sysTn n t mrTun mem X

NRC PDR HEINDWT

'fmnRnco ERNST X

I&E W

ScnnovnEn BENAROYA PALLARD

{ l OELD LAINAS SP5NGLER GOSSICK & STAFF ENGINEERING IPPOLITO I

MIPC mccAny SITE TECH CASE KNIGHT OPERATING REACTORS X CAMMILL (O ii HANAUER SIHWEIL STELLO STEPP HAnTFSS PAWLICKI I HUI.'iAN i

OPERATING TECH PROJECT MANAGEMENT REACTOR SAFETY EISENHUT SITE ANALYSIS BOYD ROSS SHA0 VOLLMER P. COLLINS NOVAK BAER BUNCH I } HOUSTON ROSZTOCZY SC!r.JENCER J. COLLINS i PETERSON CHECK GRDTS KREGER I ?ELN X

'T. DR.uRE.m"

~

IIELTEMES AT & I SITE SAFETY & ENVIRE SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER

[

EXTERNAL DISTRIBUTION CONTROL NUMBER m

' LPDR!fotT C1.mttA. C,n..

NATL LAB BROOKHAVEN NATL LAB 5

TIC REG. V-IE ULRIKSON(CRNL)

MSIC LA PDR j p b

1_

ASLB.__

CONSULTANTS l

t X_acaSUW(MOLamW I

s 8 0 01310 97 A 4

mC m R :. "*>

a d

TOLEDO EDISON Docket No. 50-346 LOWELL E RCE v c..,,,o.=

February 23, 1976 sco,e oa..oo-.=

f419) 259-5242 f5 Director of Nuclear Regulation

/M

' g k @,{,]

Attn:

W. R. Butlet, Chief

\\

Light Water Reactors Branch No. 4 9

Division of Project Management

-f (9,

}@C EE303j$76 > C U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Q

c s. 37c,~n,y Q

m b

Dear Mr. Butler:

,4

/,e In accordance with Mr. R. C. DeYoung's letter of November 7, J14 response to the Staff's Regulatory Position 2.3.1, submitted in Feo Eary 1975, and 'ur meeting with the Staff on January 28, 1976; we are submitting the following meteorological data:

1.

A correlation of temperature lapse rate between the old 300 foot meteorological tower and the new 340 foot meteorological tower, including a discussion of the rationale for the differ-ence between the data collected from the new 340 foot tower during the period August 4, 1974 thru August 3, 1975 and the data collected from the old 300 foot meteorological tower, December 1, 1969 thru November 30, 1970.

2.

A discussion of the representativeness of the year of new meteorological data, August 4, 1974 thru August 3, 1975.

Forty (40) copies of these studies are enclosed.

The one full year, August 4, 1974 thru August 3, 1975, of additional meteorological data was transmitted to the Staff in my October 24, 1975 letter to Mr. George W. Knighton.

We are ready to discuss these data with you and your staff at your convenience.

Yours very truly, j

jm d/6 1?SS THE TCLEDO ECISCN COMPANY ECISCN FLAZA 300 MADISON AVENUS TCLEDO. CHIO 43652