ML19319C088
| ML19319C088 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/14/1973 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19319C089 | List: |
| References | |
| NUDOCS 8001310457 | |
| Download: ML19319C088 (2) | |
See also: IR 05000346/1973004
Text
_
_ _ _ _
~
~
~
. . .
, ,,
v.
'
.
gd80' f
gg
UNITED STATES
1.'
gl
l
ATOMIC ENERGY COMMISSION
e
k
yp v
DIRECTORATE OF REGULATORY OPERATIONS
REGION lit
- e%s o'
799 ROOSEVELT ROAD
m
GLEN ELLYN, ILLINOIS Got t
012) e58-2460
NOV 1 4 1973
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
Gentlemen:
This refers to the inspection conducted by Mr. M. W. Dickerson of this
office on October 16, 17, and 18, 1973, of construction activities at
the Davis-Besse site authorized by AEC Construction Permit No. CPPR-80
and to the discussion of our findings at the conclusion of the inspection
with you, Messrs. Lenardson, Novak, and others of your staff.
A copy of our report of this inspection is enclosed and identifies the
N
areas examined during the inspection. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
No violations of AEC requirements were identified within the areas
examined during this inspection.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report are to be placed in the AEC's Public Document
Room. However, if the enclosed inspection report contains information
which you or your contractors believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld
from public disclosure.
In the event such an application is submitted,
it must identify the basis for which information is claimed to be
proprietary and should be prepared so that proprietary information
identified is contained in a separate part of the document, since the
application, excluding this separate part, will also be placed in the
Public Document Room.
If we do not receive an application to withhold
information, or are not otherwise contacted within the specified time
period, the enclosed report will be placed in the Public Document Room
with a copy of this letter.
0
.
G
..
gooi a19 D-
,
s
-
. .-
-
..
. .
-- .
..
-
..
.
.
Toledo Edison Company
-2-
NOV 14 1973
.
Unless you wish to make application to withhold information, no reply
to this letter is necessary; however, should you have questions con-
carning this inspection, we will be glad to discuss them with you.
Sincerely yours,
James G. Keppler
,
Regional Director
Enclosure:
RO Inspection Rpt No. 050-346/73-04
bec: RO Chief. FS&EB
RO:HQ (4)
.
Licensing (4)
DR Central Files
O
~
RO Files
Local PDR
DTIE
i
.
J
V
.,
\\
.
- _ .