Forwards Insp Rept 50-346/73-04 on 731016-18. No Noncompliance Noted
ML19319C088
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/14/1973
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319C089 List:
References
NUDOCS 8001310457
Download: ML19319C088 (2)


See also: IR 05000346/1973004

Text

_

_ _ _ _

~

~

~

. . .

, ,,

v.

'

.

gd80' f

gg

UNITED STATES

1.'

gl

l

ATOMIC ENERGY COMMISSION

e

k

yp v

DIRECTORATE OF REGULATORY OPERATIONS

REGION lit

  1. e%s o'

799 ROOSEVELT ROAD

m

GLEN ELLYN, ILLINOIS Got t

012) e58-2460

NOV 1 4 1973

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

This refers to the inspection conducted by Mr. M. W. Dickerson of this

office on October 16, 17, and 18, 1973, of construction activities at

the Davis-Besse site authorized by AEC Construction Permit No. CPPR-80

and to the discussion of our findings at the conclusion of the inspection

with you, Messrs. Lenardson, Novak, and others of your staff.

A copy of our report of this inspection is enclosed and identifies the

N

areas examined during the inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

No violations of AEC requirements were identified within the areas

examined during this inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report are to be placed in the AEC's Public Document

Room. However, if the enclosed inspection report contains information

which you or your contractors believe to be proprietary, it is necessary

that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld

from public disclosure.

In the event such an application is submitted,

it must identify the basis for which information is claimed to be

proprietary and should be prepared so that proprietary information

identified is contained in a separate part of the document, since the

application, excluding this separate part, will also be placed in the

Public Document Room.

If we do not receive an application to withhold

information, or are not otherwise contacted within the specified time

period, the enclosed report will be placed in the Public Document Room

with a copy of this letter.

0

.

G

..

gooi a19 D-

,

s

-

. .-

-

..

. .

-- .

..

-

..

.

.

Toledo Edison Company

-2-

NOV 14 1973

.

Unless you wish to make application to withhold information, no reply

to this letter is necessary; however, should you have questions con-

carning this inspection, we will be glad to discuss them with you.

Sincerely yours,

James G. Keppler

,

Regional Director

Enclosure:

RO Inspection Rpt No. 050-346/73-04

bec: RO Chief. FS&EB

RO:HQ (4)

.

Licensing (4)

DR Central Files

O

~

RO Files

PDR

Local PDR

NSIC

DTIE

i

.

J

V

.,

\\

.

- _ .