ML19319C082
| ML19319C082 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/25/1975 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Roe L TOLEDO EDISON CO. |
| References | |
| NUDOCS 8001310454 | |
| Download: ML19319C082 (1) | |
Text
~
DISTRIBUTION:
/
LWR 2-3 Rdg
'/
E 2 0 ",U Docket Fil EGoulbourne Docket No.
50-346 ASchwencer LEngle NRC PDR L PDR VAMoore The Toledo Edison Conpany LWR TCs Atta:
Mr. Lowell E. Roe ACRS (16)
Vice President, Facilities JGiannelli Developinent 300 Edison Plaza Tcledo, Ohio 42652 Gentleren:
Enclosed is a copy of our letter to Babcock & Wilcox regarding their topical rep'rt No. 3X4-10100 which is referenced in your application.
We have conpleted our review of this report and have concluded that it is acceptable :~or reference in license applications.
Sincerely, Original U; ad hl A. Schwencer, Chief Light Water Reactors Branch 2-3 Division of Reactor Licensing
Enclosure:
Letter to B&W dated 2/19/75 w/ enclosure ces: Donald H. Hauser, Esquire Leslie Henry, Esquire The Cleveland Electric Fuller, Seney, Henry & Hodge Illuminating coinpany 800 Cwens-Illinois Bldg.
P. O. Box 5000, Room 610 405 Madison Avenue Cleveland, Chio 44101 Toledo, Ohio 43604 Gerald Charnoff, Esquire Shaw, Pitt: nan, Potts, Throwbridge & Madden
'J hin o,
C 20006
',p p
Iy i C-TVRr2-1RL
. d_.
Q v7RRi orrice >
evama s >
,y 44 114e m ARe cer_.
. 2/1[/_25
_24h/_25 matu m Posen AEC.318 (Rev. 9 53) A2cM 0240 1't u. s. eavsamnesar reinvene orrics: seva.ese.ies 8001310fff
[