ML19319C069

From kanterella
Jump to navigation Jump to search
Notifies of 730917 Effective Amends to License Requirements Re Operator & Senior Operator Qualification & Util Requalification Programs.Requests Submittal of Program & Implementation within Three Months of Amend Effective Date
ML19319C069
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/23/1973
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Sampson G
TOLEDO EDISON CO.
References
NUDOCS 8001310445
Download: ML19319C069 (2)


Text

.

D

., ), _

m h.

UNITED STATES 8b--

4 y, Q ATOMIC ENERGY COMMISSION wAssmorou. o.c. ms4s 3,

a -

August 23, 1973 Uccket No. 50-346 The Toledo Edison Company ATTN: Mr. Glenn J. Sampson Vice President, Power 300 Edison Plaza Toledo, Ohio 43652 Gentlemen:

The Atomic Energy Ccmaission has amended'its regulations to require operators who manipulate the controls of nuclear power reactors and other licensed production and utilization facilities to complete a requalification program or be administered a reexamination before each license renewal and to require facility licensees to carry out adequate operator requalification programs.

An amendment to Part 55 of the AEC's regulations, which was published in the Federal Register on August 17, 1973 establishes minimum re-quirements for requalification programs including on-the-job training and lectures on basic theories and safety systems of the specific plant.

It applies to both operators and senior operators.

An amendment to Part 50 published in the Federal Register on the same date requires that an application for a license to operate a facility must include a description and plans for implementation of an operator requalification program. Also, each facility licensee must have such a program in operation within three months after issuance of an operating license. Holders of operating licenses in effect on the effective date of these-amendments, September 17, 1973, must submit an operator requalification program for Commission approval and con-currently implement that program within three months after the effective date of the amendments.

v 8001310 y4/5' y

'S,.

. Toledo Edison Co.

All power, test and reprocessing facility licensees are reques'ted to submit the required information with one signed original and thirty-nine additional copies.

If a single submittal covers more than one unit at a station, one signed original and fifty-nine additional copies All other facility licensees are requested to sub-should be provided.

mit one signed original and twenty-one additi.onal copies.

Sincerely, f

?fN D

J. Skoyholt, Assistant Director for Operating Reactors Directorate of Licensing

Enclosure:

1. A.cnd.T.cnt to 10 CFR part 50 and Part 55 cc: Mr. Leslie Henry, Esquire Fuller, Seney, Henry & H6dge 800 Owens-Illinois Bldg.

405 Madison Avenue Toledo, Ohio 43604 DISTRIBUTION:

pDR Local POR Docket Room Facility File D. J. Skovholt

+

R. G. DeYoung A. Schwencer M

k m