ML19319B951

From kanterella
Jump to navigation Jump to search
Ack Receipt of 770323 Final Deficiency Rept Re Safety Features Actuation Sys Manual Initiation/Emergency Diesel Generator Sequencer Design.Corrective Action & Test Results Reviewed on 770331
ML19319B951
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1977
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001290687
Download: ML19319B951 (1)


Text

- ~

~

~

CENTRAL FILES bbb 0 l377 Docket no. 50-346 Toledo Ydison Company ATTN:

Pr. Lowell

~4.

Roe m'

Vice Prcaident 0

0 Facilitics Developent yo Ld13cn Pls:4 300 :tadison Avenue T' D Toledo, Oli 43652

,J

-[ k

_n v

Ocntlemen:

Thank yea for your final report voted X2rch 23,1977, pursuant to 10 CC 50.55(n) ro;;arding Safccy 61tures Actuation Systar.

canual initiation / emergency diesel genarator acquencer design deficicacy. Vo revictied your correctivo action and test results on 11 arch 31,1977, relative to this catter and have no further questions at this timo.

l Your cooperntica with us is appreciated.

Sincerely, t

R. F. Ecishnan, Chief Reactor Construction and j

Engineering Support Eranch I

cc w/ltr dtd 3/23/77:

Central Files Reproduction Unit WRC 20h PDR Local PDR NSIC TIC U. Young Park, Power Siting Cor.unission

)>'k N h9 f

R II.

Rk

.,,,R,,, I g,

,r.RIII Nt 11 ms/jb Ilayes Meinhm. n Tamblini g,1 l

-e v....,

eave > - 4/7/77 _

NRCFORM 318 (9-76) NRCM 024G W u. a. aovsanusmv ementine orricae eers -eas.eae s

- *?**