Approves Util 770325 Submittal Re Adequacy of Nonseparation of Class 1E & non-class 1E Wiring Inside Reactor Protection Sys & Engineered Safety Features Actuation Sys.Noise Test Per Mil Std 1990 on non-class 1E Circuits Required
ML19319B943
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1977
From: Stolz J
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001290680
Download: ML19319B943 (3)


Text

.

Qistribui..on,

6 u,

4.-

Docket File.

IE (3) flRC PDR ACRS (16)

Local PDR V, Stello LWR 1 File K. Goller pc" cc

.,B, 7 R. C. DeYoung G. Lear D. B. Vassallo R. Wagner

,,'~

F. J. Williams Docket No.50-34G < M"":n J

J. Stolz L, Engle E. Hylton bcc: J.R. Buchanan, *! SIC Toledo Edison Company R. Heineman T.B. Abernathy, TIr ATTN: fir. Lowell E. Roe D. Ross Vice President. Facilities J. Knight Development R. Tedesco Edison Plaza H. Denton 300 Madison Avenue V, A. Mcore Toledo, Chio 43652 R. H. Vollmer M. L. Ernst Gentlemen:

W. P. Gammill ELD StJBJECT: iiOISE TEST IN ACCORDA: ICE WITil MIL. STANDARD 19900, SECTIO!!

4.6.11 TO BE CONDUCTED ON NON-CLASS IE CIRCUITS THAT INTEVACE WITH THE RPS SYSTEM - DAVIS-3 ESSE, UMIT 1 Pursuant to our request for additional infornation by letter dated " arch 17, 1977, we have completed our review of your submittal of tiarch 25, 1977, regarding the adequacy of the Davis-Cesse Unit 1 design for non-separation of class IE and non-Class IE wiring inside the Reactor Protection Svstem (RPS) and Engineered Safety Features Actuation Systen (ESFAS).

We find your submittal of test proposals which will be conducted on the RPS & ESFAS to deronstrate that the im31emented design will not decrade safety systens below an acceptable level are accectable.

However, you were advised in recent conversations with the staff that in addition to your presently oroposed tests, we will require that noise tests in accorc'ance with "il. Standard 1990, Section 4.6.11 (or ecuivalent) he conducted on the non-Class IE circuits that interfac2 with the 7PS in order to satisfy the objectives of Section 4.6 of IEEE Standard C79-1953.

A condition on the operating license for Davis-Besse, Unit I will stipulate that test procedures (as identified above) he submitted to the staff and found acceptable prior to plant operation in l' ode 2 (startun) as defined in the Davis-Besse, Unit i Technical Specificatinns.

In addition these tests shall be completed and the test results submitted for our review prior to the first-refuelings or ro later than 18 nonths of povier operation, whichever cores first.

D D

QG

.1 D ~9'T gk T m

.I 3

oresc s >

eunma ass >

ante >

Peena ABC.314 (Rev. M)). AECM 0240 W u. s. sovsenassat raintime orrican sete.eae see 80012 SONO g

,.c.

r p.

s 4

777 Toledo Edison Company 2-Please call us if you have any questions regarding these matters.

Sincerely, orf ainal signed by?

e y, v.stolz John F. Stolz, Chief Light Mater Reactors Branch fio. I Division of Project Management cc: Mee page 3 LWR 1 LWR 1

.,,,c.,

LEngle/ red JS

,e,

4/ /77 4/hf77 Feems ABC,)l3 (Rev. A53) ABCM 0240

  1. u. s. evysammany paintme orrics tota.sae ses

r y

APR y 3977

~

Toledo Edison Company 3-cc:

Mr. Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Sox 5000 Cleveland, Ohio 44101 fierald Charnoff, Esq.

Shaw, Pittnan, Fotts and Trewbridge 18u0 il Street, N, 11.

Wastiington, D. C.

20036 Leslie Henry, Esq.

Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, unio 43604 l

1 orrice >

own.sai.s >

mars >

Feren E314 (Rev. 9 53) ABCM 0240 W u. s. eovenumsw rotatino orrices tota-sestee 4

-..--w

. ~~.

,u.,s-->

...8.+

.