August 28, 1978 f-
,,?.;,
Docket No. 50-346 License No. SPF-3 Serial No. 1-30 Mr. Caston Fiorelli, Chief Feactor Operations and Nuclear Support Branch U.S. Nuc1 car Regulatory Conmission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Fiorelli:
Toledo Edison acknowledges receipt of,your Auguct 8, 1978 letter and report enclosure 78-20, referencing apparent deviations from Davis-Eesse Nuclear Power Station, Unit No. 1, co.mitments to t.,e NRC listed as an " Infraction" and " Deficiency" under the heading " Notice of Violation."
Following a thorough examination of the items of concern, Toledo Edison herein of f ers information regarding the items of non-compliance.
Item 1--Infraction: Technical Specifications Section 4.3.1.1.2.a requires that the 31-day operability demonstra-tion of each diesel generator include verification that the diesel starts from ar.bient condition and accelerates to at least 900 rpm in 10 seconds or less.
_ Contrary to the above, the 31-day operability demonstrations of the diesel generators have not included verification of diesel acceleration to at least 900 rpm in 10 seconds or less.
Response
Surveillance Test ST 5061.01, Diesel Generator Monthly Test, was revised on July 19, 197S to include verification of diesel acceleration and was performed on July 20, 1978.
AUG 3 01978 8001 M m.= =. =. = a.m
==. mm
.= m e
,., = _ m m
_. - - ~.
l I'
l I
i
r. Caston Fiorelli 1
Sa c'r e t No. 50-346 1'
Ferial No. 1-30 L
l August 28, 1978 Page 2 I
l t
I Item 2--Deficiency: Technical Specifications Section 6.10.1 regu_ ires that records of surveillance activities required
,by the Technical Specifications be retained for_
s at least five vears.
i Contrary to the above, surveillance records for the following could not be located:
a.
Containment recirculation system testing per-formed per ST 5065.06 on Februa ry 23, 1978.
I j
b.
Containment integrity monthly verification performed per ST 5060.01 during February 1978.
{
c.
Shift check data obtained per ST 5099.01 on ~~~
December 4, 1977 and December 22, 1977.
One record was ndssing for each day.
(Three records are ponerated daily.)
Response
Surveillance reviewers have been info.rmed of the importance of document control and timely reviews.
l The large backlog of unreviewed surveillance test i
results is being reduced. The increased manning I
discussed at the NRC OIE Management Meeting, I
August 16, 1978, will allow a more timely review l
of surveillance test results.
-~
Yours very truly, 0
A
[ -((
,7 I James S. Grant Vice President, Energy Supply TDM/UHG: daw W
l J