Forwards IE Insp Rept 50-346/76-06 on 760426-29. No Noncompliance Noted
ML19319B618
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/21/1976
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B619 List:
References
NUDOCS 8001270127
Download: ML19319B618 (2)


See also: IR 05000346/1976006

Text

__

- . - .

-

-

-

. _ . - - . . - .

'

,

,

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

739 rtOOSEVELT RO AD

CLEN ELLYN, ILLINots 60137

RM 21 1576

IE FILE COPY

Toledo Edison Company

Docket No. 50-346

ATIN: Mr. Lowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Centlement

1

This refers to the inspection conducted by Messrs. R. C. Knop,

R. D. Hartin, D. R. Hunter, I. N. Jackiw, and W. D. Shafer of

this office on April 26-29, 1976, of act M ties at Davis-Besse

Unit 1 Contruction Site authorized by N;.

Construction Permit

No. CPPR-80 and to the discussion of our findings with you and

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

j

inspection consisted of a selective examination of procedures

i

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were iden-

tified within the scope of this inspection.

As pointed out at the start of the inspection, and at other

times in the past, this inspection activity was for the purpose

of assessing the extent of the preparation of your staff to

implement the Toledo Edison Quality Assurance Program for Station

Oeration. As you know, this program must be implemented 90

days prior to fuel loading. Accordingly, your staff should

continue to maintain close contant with the inspector to estab-

lish a realistic schedule for reinspection of those areas which

the anelased inspection report identified as having programmetic

or implementation inadequacies.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed insnection report will

be placed in the NRC's Public Document Room, except as follows.

csunov

h

'O

'

n

>

j

,.,

a

7E

k

i/

8001270 7 7

i

l

  1. 276-19l

I

..s.

.,

--

_ . . _ . - . - - . _ ,

. _ _ _

-___

- __ _ -.

.

MAY 21 1976-

Toledo Edison Company

-2-

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty da-ys of your receipt of this letter, to

withhold such informatiou from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is courninad in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely yours,

James G. Kappler

Regional Director

Enclosures