ML19319B618
| ML19319B618 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/21/1976 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B619 | List: |
| References | |
| NUDOCS 8001270127 | |
| Download: ML19319B618 (2) | |
See also: IR 05000346/1976006
Text
__
- . - .
-
-
-
. _ . - - . . - .
'
,
,
'
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION 111
CLEN ELLYN, ILLINots 60137
RM 21 1576
IE FILE COPY
Toledo Edison Company
Docket No. 50-346
ATIN: Mr. Lowell E. Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Centlement
1
This refers to the inspection conducted by Messrs. R. C. Knop,
R. D. Hartin, D. R. Hunter, I. N. Jackiw, and W. D. Shafer of
this office on April 26-29, 1976, of act M ties at Davis-Besse
Unit 1 Contruction Site authorized by N;.
Construction Permit
No. CPPR-80 and to the discussion of our findings with you and
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
j
inspection consisted of a selective examination of procedures
i
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were iden-
tified within the scope of this inspection.
As pointed out at the start of the inspection, and at other
times in the past, this inspection activity was for the purpose
of assessing the extent of the preparation of your staff to
implement the Toledo Edison Quality Assurance Program for Station
Oeration. As you know, this program must be implemented 90
days prior to fuel loading. Accordingly, your staff should
continue to maintain close contant with the inspector to estab-
lish a realistic schedule for reinspection of those areas which
the anelased inspection report identified as having programmetic
or implementation inadequacies.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the enclosed insnection report will
be placed in the NRC's Public Document Room, except as follows.
csunov
h
'O
'
n
>
j
,.,
a
7E
k
i/
8001270 7 7
i
l
- 276-19l
I
..s.
.,
--
_ . . _ . - . - - . _ ,
. _ _ _
-___
- __ _ -.
.
MAY 21 1976-
Toledo Edison Company
-2-
If this report contains information that you or your contractors
believe to be proprietary, you must apply in writing to this
office, within twenty da-ys of your receipt of this letter, to
withhold such informatiou from public disclosure. The
application must include a full statement of the reasons for
which the information is considered proprietary, and should be
prepared so that proprietary information identified in the
application is courninad in an enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely yours,
James G. Kappler
Regional Director
Enclosures
IE Inspection Report
No. 050-346/76 -06
bec w/ enc 1:
LPDR
Central Files
U. Young Park, Power
Siting. Commission
IE Mail and File Unit
_