ML19319B610

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/76-08 on 760105-06,0211-12,27, 0319-21 & 0512-13.No Noncompliance Noted
ML19319B610
Person / Time
Site: Davis Besse 
Issue date: 06/07/1976
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B611 List:
References
NUDOCS 8001270123
Download: ML19319B610 (2)


See also: IR 05000346/1976008

Text

-_

-_

--

.

3

E FILE COPY

'

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

REGION lli

7'J9 RO OSEVELT R O AD

CLEN ELLYN, ILLINCIS C0137

J U 44

/ 1mg

Toledo Edison Company

Docket No. 50-346

ATTN

Mr. Lowell E. Roe

Vice President

Pacilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

This refers to the inspection conducted by Mr. D. W. Hayes

,

of this office on January 5 and 6, February 11, 12 and 27,

and May 12 and 13, 1976, and Mr. J. C. LeDoux on

March 19-21, 1976, relative to protective coating activities

for the Davis-Besse Unit 1 conem4 = ent vessel authorized by

'

NRC Construction Permit No. CPPR-80 and to the discussion

i

of our f4=d4nas with you and members of your scaff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

==4nad during the inspection. Within these areas, the

inspection consisted of a selective ===ination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were iden-

tified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NBC's Public Dom ===nt Room, except as follows.

If this report cournina information that you or your contractors

believe to be proprietary, you must apply in writing to this

I

office, within twenty days of your receipt of this letter, to

!

withhold such information from public disclosure. The

'

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

. J ? .,

f ,'!I,% $

,

.

$$V

2

W

/

8001270/2 3 p

? ,..e

?

-

-

-

-

-

_

-

____ _

_ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _

..

_ _.

.-.

l

.

Toledo Edison Company

- 2 --

_ ,4

j y

W will gladly discuss any questions you have concerning this

,

inspection.

Sincerely yours,

.i

D. M. Hunnicutt, Chief

Reactor Construction and

,

Engineering Support Branch

'

Enclosures

IE Inspection Rpt

No. 050-346/76-08

bec w/ encl:

J

Central Files

PDR

Local PDR

NSIC

TIC

\\

U. Young Park, Power

Siting Commission

IE Mail and File Unit

,

,

- , - - - - . -

- _ - -

--,__ ___

,,

, _ , , , , - - - . , ,

,

, , - .

-

- - _ - - , - - - - , _ - , , , , _ - - _