Forwards IE Insp Rept 50-346/76-11 on 760428-29,0602-04 & 09-11.No Noncompliance Noted
ML19319B600
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/21/1976
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B601 List:
References
NUDOCS 8001270118
Download: ML19319B600 (2)


See also: IR 05000346/1976011

Text

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

-

.

-

-

-.

UNITED STATES

IE FILE COPY

NUCLEAR REGULATORY COMMISSION

REGloN 111

799 ROCSEVELT AC AC

GLEN ELLYN ILLINCIS 69137

July 21, G76

Toledo Edison Company

Docket No. 50-346

f

ATTN

Mr. Iowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlenen:

This refers to tha investigation conducted on April 28, 29;

June 2, 3, 4, 9, 10 and 11, 1976, by Messrs. J. E. Foatar,

J. C. LeDoux and D. W. Hayes of this office and Mr. J. J. Ward

of the Region IV office relative to an alleged falsification of

an electrical inspection record and concerns regarding the

adequacy of various electrical installations at Davis-Besse

Nuclear Power Station, Unit 1.

The allegntion and the general

(

concerns were discussed with you on June 10, 1976, and the

detailed findings of this investigation were discussed with

you on July 21, 1976.

No items of noncompliance with NRC requirements were identified

within the scope of this investigation.

A copy of our report of this investigation is enclosed which

ident1fies the areas ernmined during the invest.igation, and

presents the status of various items of concern related to

-

electrical installations at the site.

As the report indicates, the NRC has spent considerable time and

effort in the investigation of the alleged falsified inspection

record. These efforts did not result in substantiation of the

allegation, or provide evidence of other record falsifications.

However, rev,iews of your quality control program documentation

did reveal deficiencies which suggest that some quality control

documents are not as ==aingful as they could be, and indicate

an overemphasis on the paperwork aspects of quality control.

od'C%

a

N

'tg

,

/ 8"'1

1

'

9

i

!

8001270/,7g

m.e

l

1

-

. - -

.

- _ - -

-

. _ _ _ - -

- _-

. .--.

. .

- -

-

- . - - -.

-.

_

_

- _ _ _

-_

- _ _ _ _ _ _ _

,

,

%

s

.

.

Toledo Edison Company

-2-

July 21,'1976

The items of concern relative to various electrical installations

at the site which were investigated as a result of the allegation

are similar to, or the same as, problems previously identified

during NRC inspections. We shall continue to periodically

review the complete reinspection of all site safety-related

wiring, cables, supports, raceways and other electrical

installations which Toledo Edison la performing according to

earlier commitments to the NRC.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed investigation report will be placed in

the NRC's Public Document Room.

We will gladly discua any questions you have concerning this

investigation.

Sincerely yours,

l

O

James G. Kappler

Regional Director

Euclosure:

IE Investigation Report

No. 050-346/76-11