ML19319B584
| ML19319B584 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/02/1975 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B585 | List: |
| References | |
| NUDOCS 8001270108 | |
| Download: ML19319B584 (2) | |
See also: IR 05000346/1975003
Text
-
-
-
-
-.
-.
-
-
..
.._ _
UNITED STATES
j
',
NUCLEAR REGULATORY COlW. 3SION
-
])
.
RECloN lit
CLEN ELLYN, ILLINol$ 60137
APft
2 1975
!
4
j
Toledo Edison Company
Docket No. 50-346
j
ATTN:
Mr. Lowell E. Roe
'
Vice President, Power
j
Edison Plaza
300 Madison Avenue
,
l
Toledo, Ohio
43652
!
1
Gentlemen:
'
J
i
This refers to the inspectior monducted by Messrs. Sutton, Naidu and
Jablonski of this office on March 5-7, 1975, of activities at the Davis-
Besse Unit 1 Construction site authorized by MRC Construction Permit No.
CPPR-80 and to the discussion of our findings with Messrs. Novak and
Lenardson and others of your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection.
Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
.
i
No items of noncompliance with NRC requirem
's were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public llocument
{
Room.
If this report contains any information that you or your contractors
'
believe to be proprietary, it is necessary that you make a written
appl . cation to this of fice, within twenty days of your receipt of this
i
letter, to withhold such information from public disclosure.
Any such
'
application must include a full statement of the reasons for which it 1:
claimed that the information is proprietary, and should be prepared so
!
the proprietary information identified in the application is contained
in a separate part of the document.
Unless we receive an application to
!
withhold information or are otherwise contacted within the specified
time period, the written material identified in this paragraph wil! be
,
placed in the Public Document Room.
!
l
!
M E'I U -
Ctuff09
- - -
,d
L E_/__
l
k- 2
3P
i
9
- w
c.
m
.
.C
l
&
b.,, n.u4N
i
Wo.#
8o01270
p
.
.
.
.
---
.-
.
.
. _ . - - -
_ . .-.
..
-.
-
..
-
_
. _
_ _. .__ . - _ _ _ _ _ _ _ _ _ _
-
i
)
~
APR
2 WIS
'
1
'
Toledo Edison Company
-2-
l
No reply to this letter is necessary; however, should you have any
,
questions concerning this inspection, we will be glad to discuss then
,
'
with you.
Sincerely yours,
I
!
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
Enclosure:
i
IE Inspection Report No.
050-346/75-03
i
bec:
IE Chief, FS&EB
{
IE:HQ (4)
'
Licensing (4)
Central Files
IE Files
,
i
I
Local PDR
l
l
4
l
!
l
i
1
I
,
1
,
1
'
)
i
'
1
i
.
i
'
.- - ..
.
. - . .
.
-
-
. .
.
.
-
. . - -
. _ . _ .
. - . . . .
. . - . - .
- - - - - - .
.-