k REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-346 REC: STOLZ J F ORG: ROE L E DOCDATE: 04/24/78 NRC TOLEDO EDISON DATE RCVD: 04/27/75 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 FURNISHING APPLICANT"S RESPONSE TO SUBJECT FACILITY"S OPERATING LIC NPF-3.
CONDITION 2.C.(3)(1). AS GIVEN IN AMEND 7, ON REACTOR COOLANT SYSTEM FLOW DATA AND TOTAL PRESSURE DROPS.
PLANT NAME: DAVIS BESSE - UNIT 1 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
o**************** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
NOTES:
1.
SEND ALL AMENDMENTS TO J.
ROE PSAR/FSAR AMDTS AND RELATED CORESPONDENCE (DISTRIBUTION CODE BOO 1)
FOR ACTION:
ASST DIR VASSALLO**LTR ONLY(1)
GR CHIEF STOLZ**LTR ONLY(1)
PROJ MGR ENGLE**LTR ONLY(1)
LIC ASST HYLTON**LTR ONLY(1)
INTERNAL:
g="c' NRC PDR**LTR ONLY(1)
' ~ * * * ' ^
I & E**LTR ONLY(2)
OELD**LTR ONLY(1)
P.
COLLINS **LTR ONLY(1)
HOUSTON 4*LTR ONLY(1)
HELTEMES**LTR ONLY(1)
CASE **LTR ONLY(1)
MIPC**LTR ONLY(1)
KNIGHT **LTR ONLY(1)
DOSNAK**LTR ONLY(1)
SIHWEIL**LTR ONLY(1)
PAWLICKI**LTR ONLY(2)
ROSS**LTR ONLY(1)
NOVAK**LTR ONLY(1)
ROSZTOCZY**LTR ONLY(1)
CHECK **LTR ONLY(1)
TEDESCO**LTR ONLY(1)
EENAROYA**LTR ONLY(1)
LAINAS**LTR ONLY(1)
IPPOLITO**LTR ONLY(1)
F.
ROSA **LTR ONLY(1)
GAMMILL**LTR ONLY(4)
VOLLMER**LTR ONLY(1)
PUNCH **LTR ONLY(1)
J.
COLLINS *4LTR ONLY(1)
KREGER**LTR ONLY(1)
KIRKWOOD**LTR ONLY(1)
EXTERNAL:
LPOR'S P T.
CLINTON, OH**LTR ONLY(1)
TIC **LTR ONLY(1)
NSIC**LTR ONLY(1)
ACRS CAT B**LTR ONLY(16)
DISTRIGUTION:
LTR 56 ENCL 0 CONTRCL NBR: -79ti7CD98-3IZE: 1P pf,.
+4o********************************
THE END
++++****+++**********+*4+*******+-
80012 3 o (p67f
-m TOLEDO
%mm EDISON LOWELL E. RCE Docket No. 50-346 7lgl*;[l_
w m ess:b y a Operating License NPF-3 L
April 24, 1978 Tf -
Serial No. 428
[!
[
p 7.'
M a
Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear 'fr. Stolz:
The information given below is our response to Davis-Besse Unit 1 Oper-ating License NPF-3, condition 2.C. (3)(1), as given in Amendment 7, on reactor coolant system flow data and total pressure drops.
The reactor coolant flow rate was determined from heat balance data taken at 90% of rated thermal power. The result was a flow rate equal to (113.4 + 2)% of the design flow rate.
The design flow race is 352,000 GPM for four-pump operation.
In this analysis of the reactor coolant system total pressure drop, the averaged reactor coolant pump head-flow (H-Q) curve was used. This curve was determined from hot performance data taken with each of the Davis-Besse four pumps. From this curve and from the above flow rate, a aystem pressure drop of 338 feet was determined. From the upper and lower uncertainty flow rates for the 90% power data, pressure drops of 331 feet and 344 feet, respectively, were determined.
Toledo Edison considers the abote information as a sufficient and satis-factory response to Operating License conditi.v _..
- 3) (1), as given in A::.endment 7.
j [ ".')
Yours very truly, EBCKETFRECopy
~
\\
h st. e/6 THE TCLECC EDISCN CCMPANY ECISCN PLAZA 3CO MACISCN AVENUE TCLECO, CHIC 43E52