ML19319B407

From kanterella
Jump to navigation Jump to search
Amend 10 to License NPF-3,removing Condition Setting Time Allowed to Complete Installation of Flow Measuring Devices for Boron Control
ML19319B407
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/26/1978
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19319B403 List:
References
NUDOCS 8001150980
Download: ML19319B407 (1)


Text

O.

n c

s THE TCLEDO EDISCli CCHPAfiY

ShD, THE CLEVELAtiD ELECTRIC ILLUMiliAT!hG CCF.PMiY DCCKET NC. 50-346 DAVIS-BESSE NUCLEAR POWER STATICM. U: TIT NO. 1 APENHiEiti TO FACILITY CPERATING LICE!.SE kendrent No.10 License.yo. HPF-3 1.

The Nuclear Regulatcry Cemission (the Comission) has founc tnat:

A.

The facility will operate in conformity with the application.

the provisions of the Act, and the rules and reculaticas of the Comission; C.

There is reascnable assurance (i) that the activities autherized by this apendtent can be ccnducted withcut endangering the haalth and safety of the public. and (ii) : Pat such activities will be conducted in ccccliance with the Cemission's regulations; C.

The issuance of this ancncrent will nct be ininical to the cerron defense and security or to the health and safety of the public; and D.

The issuance of this anenecent is in accordance with 10 CFR Part 51 of the Ccenission's regulattens and all applicable recuire-nents have been satisfied.

2.

Accordingly, the license is arended by deleting thelicense condition stated in paragraph 2.C.(3)(n) of Facility Operating License No. tiPF-3.

3.

This license amencrent is effective as of the date of issuance.

FCR THE fiUCLEAP. REGULATORY CC filSSICN 0:Mnal S!ced by John F. Stolz, Chief Light Water Reactors Branch No.1 Division of Project Panagecent o,em e imurm.

LWR 1 LWR 1 - (-

OELD LWR h EHylt6n/ red LEng$'4u -GFen2-JStodi--

u m a 5 atu e

. m..

5//N78 5/4 /78 J 5/ 1/78 5C/78 m.

NRC FORM 318 49 76) NRCM 0240 W u. s. oovsanuent reinvime arrica inte-eae.eaa 8001150 780

. _