Forwards IE Insp Rept 50-346/75-13 on 750624-26. Noncompliance Noted
ML19319B368
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/25/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe E
TOLEDO EDISON CO.
Shared Package
ML19319B369 List:
References
NUDOCS 8001150952
Download: ML19319B368 (2)


See also: IR 05000346/1975013

Text

O'

I

./s

.

,

A // l

,

'

,

-

/

UNITED STATES

'

'

'*

\\

/

NUCLEAR REGULATORY COMMISSION

REGloN lit

799 ROOSEVELT RO AD

GLEN ELLYN ILLINOIS 60137

jul 2 5 1975

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E. Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Messrs. Sutton, Naidu, and

Jablonski of this office on June 24-26, 1975, of activities at

Davis-Besse Muclear Power Station, Unit 1 authorized by URC Con-

struction Permit No. CPPR-80 and to the discuasion of our findings with

you and Messrs. Novak and Lenardson and others of your staff at

the conclusion of the inspection.

(m)

A copy of our report of this inspection is enclosed and identifies the

\\._,/

areas examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

The inspector also examined actions you have taken with respect to the

matter identified in your letter dated June 24, 1975, which we

previously brought to your attention.

We have no further questions

regarding this matter.

m

During this inspection, it was found that certain of your activities

appear to be in noncompliance with NRC requirements. The item and

reference to the pertinent requirements are listed under Enforcement

Action in the Summary of Findings Section of the enclosed inspection

report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the MRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to subc'.t to this office within

thirty days of your receipt of this notice, a written statement or

e: planation in reply, including:

(1) corrective steps which have been

taken by you, and the results achieved; (2) corrective steps which will

be taken to avoid further itecs of noncompliance; and (3) the date when

full coupliance will be achieved.

1

$

I

a

,

a

l

6

~

5!E.E

y

}

.~.

,

800123o 7 q

-

%.e

'

.

O

Toledo Edison Compatrf

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2. Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice will be

i

placed in the !!RC's Public Doctnnent Room.

If this report containe any

information that you or your contractors believe to be proprietary, it

is necessary that you make a written application to this office, within

j

twenty days of your receipt of this notice, to withhold such inforr.ation

from public disclosure. Any such application must include a full statement

of the reasons for which it is claimed that the infor=ation is proprietary,

j

and should be prepared so the proprietary information identified in the

i

application is contai.md in a separate part of the document. Unless we

.

receive an application to withhold information or are otherwise contacted

within the specified time period, the written =sterial identified in

this paragraph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely yours,

D. M. Hunnicutt, Chief

Construction and Engineering

Support Branch

Enclosure:

IE Inspection Raport

No. 050-346/75-13