ML19319B368
| ML19319B368 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/25/1975 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe E TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B369 | List: |
| References | |
| NUDOCS 8001150952 | |
| Download: ML19319B368 (2) | |
See also: IR 05000346/1975013
Text
O'
I
./s
.
,
A // l
,
'
,
-
/
UNITED STATES
'
'
'*
\\
/
NUCLEAR REGULATORY COMMISSION
REGloN lit
GLEN ELLYN ILLINOIS 60137
jul 2 5 1975
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton, Naidu, and
Jablonski of this office on June 24-26, 1975, of activities at
Davis-Besse Muclear Power Station, Unit 1 authorized by URC Con-
struction Permit No. CPPR-80 and to the discuasion of our findings with
you and Messrs. Novak and Lenardson and others of your staff at
the conclusion of the inspection.
(m)
A copy of our report of this inspection is enclosed and identifies the
\\._,/
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
The inspector also examined actions you have taken with respect to the
matter identified in your letter dated June 24, 1975, which we
previously brought to your attention.
We have no further questions
regarding this matter.
m
During this inspection, it was found that certain of your activities
appear to be in noncompliance with NRC requirements. The item and
reference to the pertinent requirements are listed under Enforcement
Action in the Summary of Findings Section of the enclosed inspection
report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the MRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to subc'.t to this office within
thirty days of your receipt of this notice, a written statement or
e: planation in reply, including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) corrective steps which will
be taken to avoid further itecs of noncompliance; and (3) the date when
full coupliance will be achieved.
1
$
I
a
,
a
l
6
~
5!E.E
y
}
.~.
,
800123o 7 q
-
%.e
'
.
O
Toledo Edison Compatrf
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2. Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice will be
i
placed in the !!RC's Public Doctnnent Room.
If this report containe any
information that you or your contractors believe to be proprietary, it
is necessary that you make a written application to this office, within
j
twenty days of your receipt of this notice, to withhold such inforr.ation
from public disclosure. Any such application must include a full statement
of the reasons for which it is claimed that the infor=ation is proprietary,
j
and should be prepared so the proprietary information identified in the
i
application is contai.md in a separate part of the document. Unless we
.
receive an application to withhold information or are otherwise contacted
within the specified time period, the written =sterial identified in
this paragraph will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
Enclosure:
IE Inspection Raport
No. 050-346/75-13
bec w/ encl:
tocal PDR
l
'
l
.
_ _ _
.
_