Forwards IE Insp Rept 50-346/75-14 on 750721-22. No Noncompliance Noted
ML19319B351
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/19/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B352 List:
References
NUDOCS 8001150937
Download: ML19319B351 (2)


See also: IR 05000346/1975014

Text

_-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

,

o

M

M

j j.' .

,

-g

,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION lit

799 ROOSEVELT RO AD

GLEN ELLYN, ILLINOIS 60137

AUG 19 1975

Toludo Edison Company

Docket No. 50-346

ATTN

Mr. Lowell E.' Roe

Vice Pr==4 dant

Facilities Development

Edison Plasa

300 Madison Avenue

Toledo, Ohio. 43652

Gentlemen:

This refers to the inspection conducted by Mr. R. D.' Martin of this

office on July 21-22,1L975, of activities at Davis-Besse Unit 1

Constructiou Site authorised bT NRC Construction Permit No. CPPR-80

and to the discussion of our findiag= with Mr. J. Evans and others of

your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas av==in=d during the inspection. Within these areas, the inspection

consisted of a selective aw=-inntion of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

No items of nanen=p14mnem with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Boom. If this report comemine any information that you or your contractors

believe to be proprietary, it is necessary that you make a written

applicatica to this office, within twenty days of your receipt of this

letter, to withhold such information from public disclosure. Any such

application must include a full statament of the reasons for which it is

c1=f=ad that the information is proprietary, and should be prepared so

the proprietary information identified in the application is cone =4nad

M

3/

p. urso,k

gc_

IIC-

,

, . .

3

3

$$no

N,,,..a.,N

8001150 73 7 q

__

!

-

.

_

i

auG 19 1975

Toledo Edison Company

-2-

in a separate part of the document. Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written material identifled in this paragraph will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely yours,

Gaston Fiore111, chief

Rasctor Operations Bram.h

Enclosura:

IE Inspection Report No.

050-346/75-14

bec w/ encl:

PDR

Local PDR

NSIC

TIC

U. Young Park, Nuclear Engineer

,