ML19319B196

From kanterella
Jump to navigation Jump to search
Forwards Order Extending Completion Date for Publication
ML19319B196
Person / Time
Site: Oconee 
Issue date: 07/08/1974
From: Bender P
NRC OFFICE OF THE SECRETARY (SECY)
To:
OFFICE OF THE FEDERAL REGISTER
References
NUDOCS 8001090737
Download: ML19319B196 (1)


Text

'

c 1.

I

'N k-r-UNITED STATES

'i fd '

ATOMIC ENERGY COMMISSION

' *[

  • l ^ l' wasmuovos on rosas July.8, 1974

.Direc;ar OffLee of'tbc Federal Register National Archives and Records Service Washington, D. C.

20408

Dear Sir:

. Attached for publication in t e Federal Register are an original and h

two certified copies of a document entitled:

~

DliKE PO',TER CC E

Docket N.

0-28 u

Order Extending Comoletion Date_

l Publication of the above document at the earliest possible date would be appreciated.

Sincerely, s.

Paul C. Bender Secretary of the Cormnission

Enclosures:

Original and 2 certified copics bec:: docket Clerk. (Dir..of Reg.)

Information Services I.egni Files (OGC)

' Office-of Cohgressional Relations-Cf FileE (SECY)

Public Proceedings Brencir (SECY) 44 E ',

i k.{I**.

00 1090737

% r !-

G

i

-.3 DilKE POWER COMPANY _

(Oconee fluclear Station, Unit 3)

Docket !!o. 50-E87 ORDER EXTENDING COMPLETION DATE Duke Power Company is the holder of Provisional Construction Permit

!!o. CPPR-35. issued by the Commission on November 6,1967, for the con-struction of the Oconee Nuclear Station, Unit 3, a 2568 megawatt (the pressurized water nuclear reactor presently under construction at the Company's site in Oconee County, Soutit Carolina, approximately e 1l _

northeast of Seneca, South Carolina.

~

the Company requested an extension of the com-On May 14, 1974 pletion date because construction of Unit 3 has been delayed du modification to high energy lines, (2) inspection and modification of The Director of reactor coolant pumps, and (3) materials shortage.

Regulatica having determined that this action involves no significant hazards consideration, and good cause having been shown, the base are set forth in a staff evaluation, dated IT.IS HEREBY ORDERED THAT the latest completion date for CPPR-35 is extended from June 30, 1974 to September 30, 1974.

FOR THE ATOMIC ENtiRGY COMMISSION OriginalSi ned by

\\.Giambusso S

A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing Date of Issuance: 8JL 5 F/.5 m.~e 0l0 f a g