ML19319B157
| ML19319B157 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/05/1973 |
| From: | Knuth D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001090642 | |
| Download: ML19319B157 (1) | |
Text
-
WP 5 197}
l Dockat Nos. 50-269 R. C. DeYoung, Assistant Director for Pressurized L'ater Reactors, L COMPLIANCE WITH THE INTERIM ACCEPTANCE CRITRRTA FOR OCO*IEE E AT 5% OF FULL POWER A conservative bounding calculation has been made to show operation at 5% of full power will not violate any of the Interim Acceptance Criteria for the case of a core flooding tank (CYT)1ine break accident. Details of this calculation RE available in our files.
D. F. Knuth, Assistant Director for Reactor Safety Directorate of Licensing DISTRIB11 TION Docket Files - $
.g PWR-4 Reading
\\'
RP Reading
.d DFKnuth N,
ASchwencer n
fs$bab m y$
6 DKDavis j
g q
N omer >
..I5bA mbTXX
.d D&
Y
/
. susp Aast >
.tmf XX..DRose V4'#1ld'
.7
-.m
..2L. -
/73.._
2/3'/73 2/ f /73 j73 f '. Foran ABC-stb Litew,9-53) AEcM 0240
- u s c.ovswwww wima onca 1972-466-963' 8001090[ W