ML19319B035
| ML19319B035 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/26/1972 |
| From: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Case E US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070533 | |
| Download: ML19319B035 (2) | |
Text
_-
N Dockot No.30-269 A.cR 2 3 W2 E. G. Case, Director Division of Reactor Standards TECHNICAL ASSIST.GCE REQUEST FOR ENGINEERING REVIEW OF OCONEE UNIT 1 DAMAGE, REPAIR AND REDESIGN DRS technical assistance is requested to: (1) determine the extent of engineering review required in connection w1th expected =odification of the B&W prototype Oconee Unit i reactor vessel internals which suffered major damage during recent hot functional tests, and (2) provide engineering review of the proposed 3&W vibration monitoring system for vessel internals.
The requested assistance involves participation in progress conference calls between DRL, Duke and B&W and review of infornation on the damage assessment, cause and fix vbich will be submitted by 3&W as work progresses.
Plant:
Oconee Unit 1 Status:
OL Docket No:
50-269 Branch:
PWR-4 Project Leader:
I. A. Peltier DRS Branch:
Mechanical Engineering and others Licensce/ Vendor:
Duke Power Company /B&W Target Date for Completion: September 25, 1972 0;:3=! S';md sy i
E8W 6 McH!,
Peter A. Morris, Director Division of Reactor Licensing ec:
F. Schroeder, DRL DRL Assistant Directors DISTRIBUTION R. R. Maccary, DRS DOCKET D. F. Knuth, DRS DRL Reading R. G. Smith, DRS PWR-4 Reading W. Mcdonald, DRL-R. W. Klecker, DRL I. A. Peltier, DRL (2)
A. Schwencer, DRL
- y. W. Karas, DRL (2)
SEE PREVIOUS CONCURRENCES r/
J 2
JBL; DTR omer >.#.RL.;.M-4......
f sumeaue >
IAPelti j _mP_
FSc.
er PAMg.rtig _
oarr >. 4/ N./.72...
41...([/.R2....
.i/
/.22..
Form AEC-SIS (Rev. 9-53) AECM 0240 tT. S. GOVERNMENT PRCrr:NG OmcE : 1,70 0 - 405 344 8001070 8 N g
Docket No. 50-269 APR 2 3 gp_
y E. G. Case, Director Division of Reactor Standards TECHNICAL ASSISTANCE REQUEST FOR ENGINH2TNG REVIEW OF OCONZE UNIT 1 DAMAGE, REPAIR AND REDESIGN DRS tech =4e=1 assistance is requested to: (1) determine the extent of engineering review required in conna.etion with expected :nodification of the B&W prototype Oconee Unit i reactor vessel internals which suffered major damage during recent hot functional tests, and (2) provide engineering review of the proposed B&W vibration monitoring system for vessel internals.
Plant Ocones Unit 1 Status:
OL Docket No.:
50-269 Branch:
PWR-4 Project Leader:
I. A. Peltier DRS 3 ranch:
Mechanical Engineering and others Licensee / Vendor:
Duke Power Company /B&W Target Data for Completion:
September 25, 1972 Peter A. Morris, Director Division of Reactor Licensing N
cc:
F. Schroeder. DRL DRL Assistant Directors DIS M B m 0N Docket
- 1. R. Maccary, DRS D. F. Knuth, DRS DRL Reading R. G. Smith, DRS PWR-4 Reading W. Mcdonald, DEL R. W. Elecker, DEL I. A. Peltier, DRL (2)
A. Schwencer, DRL F. W. Karas. DEL (2) omcE> DRL:2.WR l........DRL:
-4 DEL.;
WBs...D.RL.;.A,S.ST/ PP.,..D.RL : DD DRL:DIR p
i y
G IAPelt
- enp,, AScdiwencer RCD g,,,,
WMcpaJd4h Fqrhv.nadar SURNAME >
mmm PAMorris om > 41.&..112.......... Al./.Y.112
. 4llA...D 2...h]P 72 4]_
/72 4/
l72 Forma AEC-31s (Rev. 9-53) AftM 0240
- c. s. covrasurxT paorT po orrier i teto o. 4os.ses o m > L.4 f... G../.!.4..
..l.. ---
.- f..........
.. f -
! M...':. c.t.a L.....t s '
I.4L.