Discusses 721025 Meeting W/Util Re Addl Info Request on Failure Evaluation & Prototype Testing Program. Evaluations of BAW-10038 & BAW-10051 to Be Completed 1 Wk After Receipt of Response to NRC 721006 Request for Info
ML19319B033
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/08/1972
From: Maccary R
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001060054
Download: ML19319B033 (1)


Text

-__

~

a liOV 8 1972 i

Richard C. DeYoung, Assistant Director for Pressurized Uater Reactors Directorate of Licensing MEETING WITH APPLICANT - MEB CONCERN TO OCONEE-1 FAILURE EVALUATION AND PROTOTYPE TESTING PPSGRAM

~

Plant name: oconee-1 Licensing Stage: OL Docket No.: 50-269-Responsible Branch and Project Manager: PWRf4, I. A. Peltier Requested Completion Date:

N. A.

- Applicants response date necessary for completion af next action

-planned on project:

N. A.

Description of Response:

N. A.

Review Status:' Partial On October 25 'a meeting was held between Licensing and the applicant to discuss tha. additional infornation that was requested by MEB on Topical Reports BAW10037,19038,10050, and 10051 (oconce-1). The

- mceting concluded that the dynamic analyses are insuf ficient to provide

=a valid vibration prediction of the reactor internals due to the lack of a defined forcing function. For qualifying Oconee-1 as a valid prototype plant, topical BAV-1003S and portions of BAW-10051 should be upgraded to meet the requirements of Safety Guide 20.

The appli-cant indicated that further efforts including component testing of instrument guide tubes and incore nozzle assemblien vill be performed for better understanding of the flow-induced tibration behavior. We i

{

are preparing Topical Report Evaluations on BAW10037 and BAW10050 which indLente our acceptance of these topicals. I.AU-10038 and BAu-10051 Topical Report Evaluations will be completed one weet after receipt of adequate responses to our Request for Additional Information of October 6, 1972.

Original Signed by R. R. Maccary E. R. Maccary, Assistant Director for Engineering Directorate of Licensing cc:

Si H. Hanauer, DRTA D. F. Lange, L Docket File (50-269)

J. M. Hendrie, L.

I. A. Peltier, L L, Reading File 4.' g A. Cfnnbunsoi L H. L. Branmer L:MEB File 1

V. C. Mcdonald, L S. N. Eon,.L) h "USD7tancti CliiEfii

% ou:jm WLa e accary

$URNAME>

11/ 7 /72 lif//72 l L./7 /972_