ML19319A985
| ML19319A985 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/31/1977 |
| From: | Pasedag W Office of Nuclear Reactor Regulation |
| To: | Clark R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001020859 | |
| Download: ML19319A985 (1) | |
Text
.
>-g c
e I
4 fM August 31, 1977 l
i Robert Clark, Chief, Reactor Safeguards Licensing Branch lMEMORANDtM FOR:
W. F. Pasedag, Safeguard Engineer, Reactor Safeguards c
l-FROM:
Licensing Branch i
StM ERY OF 000 NEE SITE VISIT
SUBJECT:
Oconee Site from August 15 through 1g (an extra i
day was scheduled because of the many security problems
'l Team 5 visited the Discussions of our questions and connents with l
thereviewoftheASP).
However, essentially no pro-
~ Duke Power Company connanced on August 16.A serious problen, which is gress was made during these discussions.
not addressed in the ASP, was uncoverdd, i.e. the plant's' susc i
to sabotage during 24 to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> periods of shutdown of ~the Keowee (This Hydro Station which serves as the plant's emergency power sup The-problem is discussed in greater detail in a separate memorand meeting with NRC and Duke management representation took place o Anned i
August 19, with the following major items rema L
The licensee signed
, 3, -
Room / Access Control Station, ID badge control.The review team impression that the licensee displayed a general lack of conce k
to meeting minutes.
security matters at the corporate and local levels of management, i
j-urh-
'\\
j W. F. Pasedag,J eguard Engineer Reac6er Safeguards Licensing Branch Division of Operating Reactors l
I
~!
DISTRIBUTION:
1-
.}.
Docket File
. g RSLB Reading
.\\
i t
I t-1 RSLB: DOR i, c.c.*
77213039s l
WFPaNdac:s1 a
~
8/M /77' S~
~ ~~ ~ - -] ~
I wy N u. s. oovsanusut rainvine orre p
g-
' NRC FORM 318.(976) NRCM 0240
-, m.
..